ML20009F728

From kanterella
Jump to navigation Jump to search
Forwards LER 81-071/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009F728


LER 81-071/03L-0:on 810426,while in Mode 4,initial Fuel Loading,Only Boration Flow Path Extended from Refueling Water Storage Tank to RCS Through Centrifugal Charging Pump 1B.Caused by Fully Open Valve.Valve Repositioned
ML20009F734
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/26/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F734 (1)
Forwards LER 81-071/03L-0.Detailed Event Analysis Encl
ML20009F727
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/26/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F727 (3)