ML20009F364

From kanterella
Jump to navigation Jump to search
Summary of 810603 Meeting W/Util Re Applicant Plans for Correcting Deficiencies Identified in Control Room Design Audit
ML20009F364
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/22/1981
From: Kintner L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8107310060
Download: ML20009F364 (2)


Text

my gy "y

q,.a

+

w w

u e

d Docket File TERA JUL Z % 19g3

((

NSIC TIC Docket No.: 50-341 b

[g\\

,p-APPLICANT: Detroit Edison Company T

I, g s

6 FACILITY:

Fermi 2

/.J L

SUBJECT:

SUPetARY OF JUNE 3,1981 MEETING REGARDING OPERAT ~ M 2 7 I907 ~2\\

--i pro" Z 9 5 # S 55 #

3 LICENSE REVIEW co

[

b' NRC staff (R. Schemel, R. Ramirez, and A. Ramey-Smith) and consu nts %t\\

/

with Detroit Edison personnel (G. Sharma, F. Abramson, J. Brooks, JN a a) to hear applicant's plans for correcting deficiencies identified in the control room design audit.

The deficiencies identified by the NRC in its control room design review were addressed by the applicant, and corrections, where needed, were specified.

These corrective measures were subsequently provided in a letter to the staff

' dated June 5, 1981.

Our evaluation of control room design, including results of this meeting are provided in Appendix D to the Fermi 2 Safety Evaluation Report (NUREG-0798).

IMgaan steed by Imeer L. matur L. L. Kintner, Project Manager Licensing Branch No. 1 Division of Licensing cc: See next page

~

8107310060 Es10722 PDR ADOCK 05000341 A

PDR 71h

.i n,

o,,c4.DL:LB#1 (

D

'" "' I.l.KjD. 0.erfy.s..BJ.

,,, ood.

t 7/

7 1

... f...V81 ca. < >

nac ronu ais mo,soinacu o24o OFFICIAL RECORD COPY

' " '98 - 329 824

i Mr. Harry Tauber Vice President Engineering & Construction Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 cc: Eugene B. Thoaas, Jr., Esq.

LeBoeuf, Lamb, Leib.y & MacRae 1333 New Hampshire Avenue, N. W.

Washington, D. C.

20036 Peter A. Marquardt, Esq.

Co-Counsel The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Mr. William J. Farner Project Manager - Fermi 2 The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Mr. Larry E. Schuerman Detroit Edison Company 3331 West Big Beaver Road Troy, Michigan 48084 David E. Howell, Esq.

3229 Woodward Avenue Berkley, Michigan 48072 Mr. Bruce Little U. S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Dr. Wayne Jens Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226