ML20009E740

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-454/81-07 & 50-455/81-06 on 810609-11.No Noncompliance Noted
ML20009E740
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/07/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20009E741 List:
References
NUDOCS 8107280406
Download: ML20009E740 (2)


See also: IR 05000454/1981007

Text

{{#Wiki_filter:[[ o,, UNITED STATES

.,., g NUCLEAR REGULATORY COMMISSION g t r REGION 111 i Q, [ 't99 ROOSEVELT ROAD g ,o* GLEN ELLYN, ILLINOIS 60137 FJUL 7 19 91 0 e .\\ o. p,, Docket No. 50-454 I Docket No. 50-455 2 .j{J[ 2 T 1981n ~ ~1 S u k g rm Commonwealth Edison Company ' E ATTN: Mr. Cordell Reed Vice President Y Post Office Bo:: 767 'q / Chicago, IL 60690 f* Gentlemen: This refers to the routine safety inspection conducted by Mr. J. H. Neisler of this office on June 9-11, 1981, of activities at Byron Nuclear Power Station, Units 1 and 2, authorized by hTC Construction Permits No. CPPR-130 and No. CPPR-131 and to the discussion of our findings with Mr. G. Sorensen and other members of your staff at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and in- terviews with personnel. No items of noncompliance with NRC requirements were identified during the course of this inspection. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the h7C's Public Document Room. If this report contains any information that you or your contrattors believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within seven (7) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such information. Section 2.790(b)(1) requires that any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full state- ment of the reasons on the basis which it is claimed that the information 8107280406 810707 DR ADOCK 05000454 Nh l PDR l

_ _ _ - _ _ _ _ _ - _ _ _ _ _ . . Commonwealth Edison Company -2- JUL 7 19 81 should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor- purated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room. We will gladly discuss any questions you have concerning this inspection. Sincerely, R. F. Heishman, Acting Director Division of Resident and Project Inspection Enclosure: IE Inspection Reports No. 50-454/81-07 and 50-455/81-06 cc w/ encl: J. S. Abel, Director of Nuclear Licensing Gunner Sorerisen, Site Project Superintendent V. I. Schlosser, Project Manager R. E. Querio, Station Superintendent DMB/ Document Contorl Desk (RIDS) Mary Jo Murray, Office of Assistant Attorney General Myron M. Cherry RIII RIII RII gg,so 9 a es Hebbman g % _ -- - }}