Forwards LER 81-011/03L-0.Detailed Event Analysis Submitted
Date released: 01/23/2020 Download: ML20009E596


LER 81-011/03L-0:on 810528,during Insp of Unexpected Alarm, CS Header Break Detection Instrument Switches Found Piped to Incorrect Lines.Caused by Connection to Wrong Line at Drywell Penetration.Instruments Connected to Proper Lines