ML20009E458

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-546/81-11 & 50-547/81-11 on 810601-30.No Noncompliance Noted
ML20009E458
Person / Time
Site: Marble Hill
Issue date: 07/15/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML20009E459 List:
References
NUDOCS 8107280225
Download: ML20009E458 (2)


See also: IR 05000546/1981011

Text

,

.

.

Jtil 1 d 1981

<

Docket No. 50-546

F4

v

Docket No. 50-547

$

e'

d

1I

.g

Public Service of Indiana

t

JUL 2 71981 * k

ATTN:

Mr. S. W. Shields

g-

u.s. tasse amuren

Senior Vice President

8 0 * '58 *

'd

Nuclear Division

'

h n@_ .y.. ((/

Post Office Box 190

&

/

New Washington, IN 47162

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. J. Harrison

of this office on June 1-30, 1981, of activities at Marble Hill Nuclear

Generating Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with

Messrs. Petro, Ramsett, and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven

(7) days from the date of this letter of your intention to file a request

for withholding; and (b) submit within twenty-five (25) days from the date

of this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

48

I

8107280225 810715

DR ADOCK 05000546

PDR

A

_-

-

3

+

.

..

Public Service of Indiana

-2-

'g }$ g

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4).

The.information sought to be withheld shall be in-

corporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Ree:n.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

9

g

&

F. Heishman, Acting Director

Division of Resident and Project

Inspection

Enclosure:

IE Inspection

Reports No. 50-546/81-11

and No. 50-547/81-11

cc w/ encl:

W. M. Petro, Executive Director

Nuclear Project Management

C. Kammerer, CA

J. H. Sniezek, IE

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

LeBoeuf, Lamb, Leiby & MacRae

Dave Martin, Office of

Attorney General

John R. Galloway, Staff Director,

Environment, Energy and Natural

Resources Subcommittee

E. P. Martin, Wabash Valley Power

Association

RI

R

RII

RIII

RIII

arrison/jp

Schweibinz

itt e

Kn

-

us

h/9/81

7 - 1 3 - 31

ql)d

,-

. --

.

. . -

. . . . - . - -