Docket No.: 50-341 t7
,.s. g e I j,
APPLICANT: Detroit Erlison Company,
b,3 V
r-T',
s Lrg3,f FACILITY:
Fermi 2
'N-
SUBJECT:
SUP9%RY OF M4Y l'l.MAY 15, 1981, MEETING REGARDING OPERATING
~
LICENSE REVIEW The purpose of the meeting was to conduct a, fire protection rayjew at the Femi 2 plant. NRC staff conducting the review were R. Anand/A. Saeed,an'd J. Beam (Gage-Babcock, consultant)... Detroit Edison representatives included W. Fahrner, W. Colbert, L. Schuerman, R. Anderson.and J. Honkala..
In preparation for the meeting, the plant drawings of routings of cable trays and conduits for safety-related equipment,were marked-up by the applicant.to identify areas that require modifications in order to meet current NRC staff criteria. As a part of the review the staff examined the relationship of safety related components, systems and structures.in specific plant areas to both combustible materials and. to fire detection and suppression systems.
The review included an evaluation of, the automatic and_ manually operated water and gas fire suppression _ systems, the fire, detection pystems, fire barriers, fire doors and dampers, fire protection administration controls, and the fire brigade size and training.,
Results of our review are in'cluded in the, fire protection safety analysis by the Chemical Engineering Branch Appendi,x E to the' Femi 2 Safety _ Evaluatic,n Report (NUREG-0798).
.)
L. L. Kintner, Project Manager Licensing Branch No. 1 Division of Licensing cc: See next page t
1 8107270380 810721 PDR ADOCK 05000341 F
PDR ct1/
mMI DL:LB#1.Q.'M...... )k'
- onic, p ausuam) LLKintner/..lg B
100 <i 7
g g-.-.
OATEk.,.797 g;....
.nne ronw ais.io soinacu o24o OFFICIAL RECORD COPY -
' " '***32"2'
Mr. Harry Tauber Vice President Engines"ing & Construction Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 cc: Eugene B. Thomas, Jr., Esq.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N. W.
Washington, D. C.
20036 Peter A. Marquardt, Esq.
Co-Counsel The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Mr. William J. Farner Project Manager - Fermi 2 The Detroit Edison Company 2000 Seccod Avenue Detroit, Michigan 48226 Mr. Larry E. Schuerman Detroit Edison Company 3331 West Big Beaver Road Troy, Michigan 48084 David E. Howell, Esq.
3229 Woodward Avenue Berkley, Michigan 48072 Mr. Bruce Little U. S. Nuc'. ear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Dr. Wayne Jens Datroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 4
i
a a
MEETING
SUMMARY
DISTRIBUTION JUL 211981 iBocket: File?
G. Lear NRC PDR" W. Johnston Local PDR S. Pawlicki TIC /NSIC/ Tera V. Benaroya N. Hughes Z. Rasztoczy LBf1 Reading W. Haass H. Denton D. Mulle*
E. Ca.e R. Ballard D. Eisenhut W. Regan R. Purple D. Ross
- 3. J. Youngblood P. Check A. Schwencer F. Congel F. Miraglia
- 0. Parr J. Miller F. Rosa G. Lainas W. Butler R. Vollmer W. Kreger J. P. Knight R. Houston R. Bosnak F. Schauer L. Rubenstein R. E. Jackson T. Speis Project Manager L. Kintner M. Srinivasan Attorney, OELD J. Stolz M. Rushbrook S. Hanauer OIE (3)
W. Gammill ACRS (16)
T. Murley R. Tedesco F. Schroeder D. Skovholt M. Ernst NRC
Participants:
R. Baer C. Berlinger R. Anand, A. saeed K. Kniel G. Knighton A. Thadani D. Tondi J, Kramer D, Vassallo P. Collins D. Ziemann bcc:
Applicant & Service List 1