Forwards IE Insp Repts 50-460/81-05 & 50-513/81-05 on 810421-23.No Noncompliance Noted
ML20009E185
Person / Time
Site: Washington Public Power Supply System
Issue date: 07/01/1981
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20009E186 List:
References
NUDOCS 8107270200
Download: ML20009E185 (2)


See also: IR 05000460/1981005

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _

_ _ . _ _ _ _ . _

_ _ _

, , _

m__

phu -

'

r. m n re nr2

,

gacecg .

Mm e T TM=**-arW H E. D

bNITED' STATES

T

o8 y, y

p,

NUCLEAR REGULATORY COMMISSION

g.'p(#-i[I

FOR DCS PROCESSING

.'C

WASHINGTON, D. C. 20555

i

,,Y,../

July 1, 1981

Original document not available

to NRC

-

"e

Docket Nos. 50-460/513

Certifi

4/,MCh

,

t-

s ci4

9

' ,

Washington Public Power Supply System

g@# g

ATTN: Mr. D. W. Mazur

g.

g

Program Director, WNP-l/4

a

N

T

4

!!

3000 George Washington Way

"

k.

C

Richland, WA 99352

7

g

,,,

k,f,%\\\\'jf '

Gentlemen:

/

This refers to the inspection conducted by "- NRC inspection team iifentified

in the enclosure, during the period of April 21-23, 1981 of your activities

being performed relative to the environmental qualification of safety-related

electrical equipment and to the discussions of our findings with Mr. G. C. Sorensen

and other members of your staff at the conclusion of the inspection.

This inspection was part of NRC's program of reviewing environmental qualification

of equipment used in harsh environments of nuclear facilities. The program

is intended to provide assurance that qualification testing of selected equip-

ment is performed in accordance with the criteria and guidelines of NUREG-0588

and IEEE Standard 323-1974 and applicable daughter standards.

The inspections

are intended to assess the adequacy of a particular environmental qualification

test program by reviewing the test plans and associated procedures prior to

test performance so that any comments relative to the test methodology may be

considered in a timely manner. You should not conclude that the NRC's inspections

replace or decrease a licensee's responsibility in determining the acceptability

,

of any specific product or service.

The enclosed copy of our inspection report identifies areas examined during the

inspection including the evaluation of the test plans intended for use in the

qualification of electrical terminations manufactured by the Burndy Corporation

and a solenoi operated valve manufactured by the Target Rock Corporation.

The results of our review of the test plans and discussions with cognizant

personnel indicated that the qualification test program generally conforms to

the guidelines of IEEE 323-1974 and NUREG-0588.

In order to more accurately

describe the test program, the test plans should be revised to document certain

test methods or specimen preparation as discussed in the enclosed inspection

report.

In accordence with Section 2.790 of the Commission's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter will be placed

in the Commission's Public Document Room.

If this report contains any infor-

mation that you believe to be proprietary, it is necessary that you make a

written application within ten (10) days to this office to withhold such

i

information from public disclosure. Any such application must include a full

l

statement of the reasons on the basis of which it is claimed that the information

I

is proprietary, and should be prepared so that proprietary information identified

-gGol

s

8107270200 810701

)

PDR ADOCK 05000460

G

PDR

_ _ _ _ _ _ _ _ _ - _ _ _ _ .

-

.

.

.

.

,

.

.

_2_

in the application is contained in a separate part of the document.

If we do

not hear from you in this regard within the specified period, the report will

be placed in the Public Document Room.

As discussed with you by our inspectors, this inspection is the first of several

that we are planning with respect to the Burndy and Target Rock environmental

qualification test programs. To enable efficient continuation of our reviews

it is requested that we be informed of the planned inspection test points for

the following activities:

Specimen Preparation: (radiation, thermal, wear aging; baseline and

vibration testing)

Seismic Testing

Accident Radiation Testing

Test Set-Ups

LOCA/MSLB Environmental Testing

In addition to the above information, please provide a response to the inspection

team's comments discussed in the Exit Interview, paragraph E of the enclosed copy

of our inspection report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Please forward your response to this office with a copy

to Mr. G. W. Reinmuth, U.S. Nuclear Regulatory Commission, Washington, DC 20555.

Your cooperation in these matters is appreciated.

Sincerely,

Obh

R. H. Engelken, Director

Region V

Office of Inspection

and Enforcement

Enclosure:

Inspection Reports Nos. 50-460/

81-05; 50-513/81-05