Requests Addl Info Re FSAR Review.Schedule for Submittals Should Be Forwarded within 10 Days
ML20009E048
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/29/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Tauber H
DETROIT EDISON CO.
References
NUDOCS 8107270025
Download: ML20009E048 (4)


Text

7.-

?

1 JUN 2 S 1981

/ g-?r [g!,4 DISTR.IBUTION

, Docket hx; g

NRC PDR h((

DocketNo.750-341 1931"h U

gl g n 0

-12 TERA wo" 1

w (C u.s. % s#

LB#1 Reading BJYoungblood Mr. Harry Tauber, Vice President

\\4, \\

/

MRushbrook Engineering & Construction b,N

'\\

LKintner Detroit Edison Company N:

0 ELD 2000 Second Avenue 01&E(3)

Detroit, Michigan 48226 ACRS(16)

Dear Mr. Tauber:

Subject:

Request for Additional Infomation As a result of our status ieview of your Fermi 2 FSAR, we have determined that there are a number of review matters still outstanding which require additional infomation in order for us to complete our evaluation. A list of the review areas for which this information is required is provided in the Enclosure. The specific information required has been discussed with your representatives.

To maintain our licensing review schedule for the Femi 2, it is raquested that you inforn us within ten (10) days after receipt of this letter of your schedule of when you plan to submit your responses to our request for additional infomation.

We urge your prompt consideration of this matter since it directly affects the licensing actions for ycur plant.

Should you have any questions on these matters, contact the licensing project manager.

Sincerely, Originnt signed by grt L. Tedesco Robert L. Tedesco, Assistant Director for Licensing Division of Licensing

Enclosure:

Request for Additional Information cc w/ enc 1:

See next page 8107270025 810629 PDR ADOCK 05000341 A

PDR DL:(. I l

D 1

DL

.OFFECE >

J...

suan4uch.L.h....D.k.d.l b, BJ,,Y,h, u

,, ood RLT t s,co.

.6i. G bl.5..

. 6t

.81......

. 6th.81...

osrn y sac ronu ais oo-sci nacu oao OFFICIAL RECORD COPY usam m:-swo u

Mr. Harry Tauber Vice President Engineering & Construction Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 cc:

Eugene B. Thomas, Jr., Esq.

David E. Howell, Esq.

LeBoeuf, Lamb, Leiby & MacRae 21916 John R 1333 New Hampshire Avenue, N. W.

Hazel Park, Michigan 48030

' Washington, D. C.

20036 Mr. Bruce Little Peter A. Marquardt, Esq.

U. S. Nuclear Regulatory Commission Co-Counsel Resident Inspector's Office The Detroit Edison Company 6450 W. Dixie Highway 2000 Second Avenue Newport, Michigan 48166 Detroit, Michigan 48226 Dr. Wayne Jens Mr. William J. Fahrner Detroit Edison Company Project Manager - Fermi 2 2000 Second Avenue The Detroit Edison Company Detroit, Michigan 48226 2000 Second Avenue Detroit, Michigan 48226 Mr. Larry E. Schuerman Detroit Edison Company 3331 West Big Beaver Road Troy, Michigan 48084 s

i Fermi 2 SER 1

1.

IST Pumps, Valves.

2.

Pressure Isolation Valves.

J 3.

Mark'I Containment Loads.

4.

SRV Wetwell piping.

5.

Hi-density Fuel. Storage.

6.

Seismic Structural Margin.

7.

Mark I Containment.

? -

8.

Foundation Engineering.

9.

Fracture Toughness (GDC-51).

10.

Exemptions - Appendix G & H.

11.

Fracture Toughness, ESF, MS. FW.

12.

Environmental Oualification (NUREG-0588).

13.

II.E.4.2 (6) Qualification of Containment Purge Valves.

14.

Fire Protection.

15.

II.B.3 Post-Accident Sampling.

16.

Updated Section 17.2.

17.

Handling Light Loads.

18. Loss of I&C Bus (IE 879-27).
19. Qualification ~ of Controls.
20. Control Systems Failures.
21. LPCI Diversion.
22. Conformance to GDC-55, 56, 57,
23. Appendix J, Leakage Tests.

24.

II.E.4.2 Containment Isolation Dependability.

25.

I.D.1 Control Room Design.

26.

Updated FSAR Section 13.

27.

I.C.5 Feedback of Experience.

28.

I.C.6 Verify Operating Activities.

t

... ~..,,,,..,. _

~.,.

,.y

,w,.,,,

,m,

..t,-y

,.~

l 1 Fermi 2 SER i:

?'

i.

29. 'ATWS Emergency Procedure.

30; 11.G.1. Procedures for Special Low Power Tests.

-31. -I.C.1 Emergency Procedures.

32.

I.C.7 NSSS Vendor Review of Procedures.

33. Physical Security Plan.

4 4

9 1

i

?

i e

s I

i 4

f-f I

f 4

l

[-

t' f

s L

t I

h t

---S e

-e---e,

-v er c.,,--+

..,+m

  • -w

-.-cy.-

c,m.1-~.,

,,.,,w ew-,,

ww--e.--...

es--.we.---e,-.em.

---,,.,w=-.

e-n w w w -,- 4,cm.,-w e-y-w +