Forwards IE Insp Repts 50-327/81-21 & 50-328/81-25 on 810513-20.No Noncompliance Noted
ML20009D866
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/16/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20009D867 List:
References
NUDOCS 8107240440
Download: ML20009D866 (2)


See also: IR 05000327/1981021

Text

FJ

.

L a\\ ~ }rmo ,

OFFICIAL SOP

>

u%

  1. -

'

UNITED STATES

gg

'

i*

. *' %

NUCLEAR REGULATORY COMMISSION

5

' ^lh $

REGION 11

k[

101 MARIETTA ST., N/N.. SUITE 3100

p. .

'

  • +

ATLANTA.GEORCI A 30303

.."s#

JUN 161%I

L} ]g

Tennessee Valley Authority

[(f

ATTN: Mr. H. G. Parris

3

s.

Manager of Power

,ll-

p M 2 31937 w C[

500A Chestnut Street Tower II

Chattanooga, TN 37401

g E5 g

,,

Gentlemen:

' . ,

4'

Subject: Report Nos. 50-327/81-21 and 50-328/81-25

This refers to the routine safety inspection conducted by Mr. A. L. Cunningham of

this office on May 13-20, 1981, of activities authorized by NRC Operating

License No. DPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility

and to the discussion of our finding: held with Mr. M. R. Harding Compliance

Supervisor, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel,_ and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), , such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld snall be incorporated as far as possible into a separate

part of the affidsvit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

11M

S

I (

nR7muoM%

O

-.

.

- .--

-

- ,

.

.

-

- .

_ . ,

-. .

..

r;

  • \\

.

.

JUi1 16196;

Tennessee Valey Authority

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Ab? (:,

R. C.

w s, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-327/81-21

and 50-328/81-25

~

cc w/ encl:

H. J. Green, Division Directo-

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

t

,- -

-.