ML20009D866
| ML20009D866 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/16/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20009D867 | List: |
| References | |
| NUDOCS 8107240440 | |
| Download: ML20009D866 (2) | |
See also: IR 05000327/1981021
Text
FJ
.
L a\\ ~ }rmo ,
OFFICIAL SOP
>
u%
- -
'
UNITED STATES
gg
'
i*
. *' %
NUCLEAR REGULATORY COMMISSION
5
' ^lh $
REGION 11
k[
101 MARIETTA ST., N/N.. SUITE 3100
p. .
'
- +
ATLANTA.GEORCI A 30303
.."s#
JUN 161%I
L} ]g
Tennessee Valley Authority
[(f
ATTN: Mr. H. G. Parris
3
s.
Manager of Power
,ll-
p M 2 31937 w C[
500A Chestnut Street Tower II
Chattanooga, TN 37401
g E5 g
,,
Gentlemen:
' . ,
4'
Subject: Report Nos. 50-327/81-21 and 50-328/81-25
This refers to the routine safety inspection conducted by Mr. A. L. Cunningham of
this office on May 13-20, 1981, of activities authorized by NRC Operating
License No. DPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility
and to the discussion of our finding: held with Mr. M. R. Harding Compliance
Supervisor, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel,_ and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), , such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld snall be incorporated as far as possible into a separate
part of the affidsvit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
11M
S
I (
nR7muoM%
O
-.
.
- .--
-
- ,
.
.
-
- .
_ . ,
-. .
..
r;
- \\
.
.
JUi1 16196;
Tennessee Valey Authority
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Ab? (:,
R. C.
w s, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-327/81-21
and 50-328/81-25
~
cc w/ encl:
H. J. Green, Division Directo-
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff