. , p now
OFFICIAL COPY
i';
-[
D
UNITED STATES
"o
e
,
!
t,
NUCLEAR REGULATORY COMMISSION
O/
,
y-
., $
REGION ii
n
8
101 MA RIETTA ST., N.W.. SUITE 3100
ATLANTA, GEORGIA 30303
y
++...
JU N 241981,gbu
(g(jfgh
Tennessee Valley Authority
ATTN: Mr. H. G..Parris
/ A
-Manager of Power
p]
,
i
U
A
4,l
500A Chestnut Street Tower II
"
2 3 79g
%
(
"'8 % g
- j
Chattanooga, TN 37401
Gentlemen:
b
Subject: Report Nos. 50-518/81-09, 50 519/31-09, 50-520/81 d9i tand 50-521/El-09
This refers to the routine safety-inspection conducted by Mr. W. B. Swan of this
office on May 1-31, 1981, of activities -authorized by NRC Construction Permit
Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153 for the Hartsville facility and
' .the discussion of our findings held with Mr. R. T. Hathcote, Site Project
honager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
anforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If 'the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) s ubmit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for youryeview, please notify this
office promptly so that a new due cate may be established.
Consistent with
section 2.790(b)(1), such application n.ust be accompanied by an affidavit
executed by the owner of the information which identifies the documer.t or part
~
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
i
,
I
(
8107240404 810624
PDR ADOCK 05000518
G
pon
.
- .
-
- - -
-
-
-
-
.
.
_
_ _ - .
-.
.
,
-
.
. .
JU N 241981
Tennessee Valley Authority
2
part of the affidavit.
If we do not hear from you in this regard within the
-
- specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
.them with you.
- l
Sincerely,
.
E.c.
R. C.
ewis, Acting Director
Division of Resident and
i
Reactor Project Inspection
Enclosure:
4
. Inspection Report Nos. 50-518/81-09,
50-519/81-09, 50-520/81-09, and
50-521/81-09
cc w/ encl:
H. J. Green, Division Director
R. T. Hathcote,. Project Manager
.J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E.- Wills, Project Engineer
H. N. Culver, Chief
Nuclear' Safety Review Staff
!
-
h
I
.
- .
.
-
- - - -
..--
. -.-- --
--
-.