Text
f
~
l
'
OFFICIAL COPY
,
.f
UNITED STATES
[
o
8^'
3s
NUCLEAR REGULATORY COMMISSION
i
3-
aE
REGION ll
k
101 M* RIETTA ST., N.W., SUfTE 3100
ATLANTA, GEor* CIA 30303
Q/g
JUN 1 B 1981
<
Tennessee Valley Authority
g[
ATTN:
H. G. Parris
-
e
- Manager of Power
th
JUL 2 31981*
500A Chestnt t Street Tower II
,,,,,m maxa q
-
- '55"
Chattanooga, TN 37401
g-
h,
q
.o.
Gentlemen:
$
~
'
Subject: Report Nos. 50-566/31-06 and 50-567/81-06
This refers to the special inspection conducted by Mr. J .
L.
Coley of this
office on May 7-8, 1981, of activities authorized by NRC Construction Perm't
Nos. CPP."-172 and CPPR-173 for the Yellow Creek facility and to the discussion
of our findings held with Mr. G. J. Pitzl, Metals Application Supervisor, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report-
Within these areas, the inspection consisted of
.
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We _ have examined actions you have taken with regard to previously identified
eaforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to. file a request for withholding; and (b) submit within twenty-five
days from tiie date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
,
that less then seven days are available for your review, please notify this
office promptly so' that a new due date may be established.
Consistent with
sect. ion 2.790(b)(1), such apolication must be accompanied by an affadavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons cn the basis
of which it.is claimed that the information should be withheld from public
,
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
TW
s
1 I
-
' f!107240346 810618
PDR ADOCK 05000566
g
. /
'
l'
-t
.
t'
4
0
bl
Tennes. e
'! alley Authority-
2
i
,
Should you'have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
sd5 t[.
'
R. C.
wis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-566/81-06
and 50-567/81-06
cc w/ encl:
H. - J. Green, Division Director
-J. F. Cox, Supervisor, Nuclear
Licensing Section
M. M. Price, Project Manager
'M. A. McBurnett, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
.
e
,
'
k.
]