ML20009D639

From kanterella
Jump to navigation Jump to search
Ro:On 810715,util Review Committee Met to Consider Info Received on 810714 from Bechtel Re Investigation of Masonry Walls,Per IE Bulletin 80-11.Stresses in Walls of Control Room Exceeded Revised Acceptance Criteria Limits
ML20009D639
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 07/16/1981
From: Porter D
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-11, NUDOCS 8107240244
Download: ML20009D639 (2)


Text

u Wisconsin Electnc eoweacouesur "231 WEST MICHIGAN, MILWAUKEE, WISCONSIN 53201 July 16, 1981 N

r os Mr. J.

G. Keppler, Regional Director F

/

Office of Inspection and Enforcement, N m '(c Region III D

q/

1 U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road b

t 7

Glen Ellyn, Illinois 60137 g

f f,

/,-

[ \\,

Dear Mr. Keppler:

v J

1' LICENSEE EVENT REPORT NO. 81-009/'1T-0 24-HO_UR WRITTEN NOTIFICATIO

IE BULLETIN 80-11, MASONRY BLOCK WALL Ih/ESTIGATION POINT BEACH NUCLEAR PLANT, UNIT 1 Licensee Code.

WIPBH1' Docket No.:

50-266 License Type:

41111 Report Source:

L License Number:

00-00000-00 Event Date:

07/15/81 Event

Description:

.During the afternoon of July 15, 1981, the Wisconsin Electric Power Company Nuclear Engineering Safety Review Committee met to consider information received on July 14, 1981 from the Bechtel Power Corporation regarding the investi-gation of masonry block walls at the Point Beach Nuclear Plant.

Bechtel has been retained by Wisconsin Electric to conduct masonry wall investigations and analyses in accordance with the require-ments of IE Bulletin 80-11.

On July 14, 1981 Bechtel reported

by -telephone that their analyses of several of the walls in the Point Beach Nuclear Plant control room and battery rooms indicated that in the event of an SSE, stresses in these walls exceeded the revised acceptance criteria stress limits as established during the meeting between Licensee and the NRC Staff on June 9-11, 1981.

Modification or reinforcement of the walls will be required to correct these conditions.

The Nuclear Engineering Safety Review Committee has reviewed and evaluated tais information and deter-mined that discovery of this condition is reportable under the g/

provisions of Technical Specification 15.6.9.2.A.9.

}

The Nuclear Engineering Safety hview Committee evaluation of this information included the determination that continued operation

/

of the Plant pending modifications to these walls is justified.

Details of the operability determination and the proposed modifi-cations for these walls will be included in the 14-day report.

0107240244 810716

@ ~17.~ )ggj PDR ADOCK 05000266

_1 S

PDR

... t m

Mr. J. G. Keppler July 16, 1981 This Licensee Event Report is also applicable to Point Beach Nuclear Plant, Unit 2,. Licensee Code WIPBH2, Docket No. 50-301.

The Resident Inspector has been notified of this event.

Telephone: 414/277-2144 D.

K.

Porter r

{

-.