FOIA Request for Five Categories of Info Re Facility & B&W
ML20009D168
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/15/1981
From: Michael Brown
CARLTON, FIELDS, WARD, EMMANUEL, SMITH & CUTLER
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-81-236 NUDOCS 8107230244
Download: ML20009D168 (3)


Text

, , . .. . ..

l

. n .

CARLTO N, F nLDs, WA R D, EM MAN UEL, S M ITH & CUTLER, P. A.

ATTORNEYS AT lE

, THE EXCHArdGE BANK BUILDING CNA BUILDING 200 EAST GOVERNMENT ST. LEWIS STATE BANM BUILDING P.O. box 3239 P.O BOX 8678 P.O. BOX tI426 P.O. ORAWER I90 TAMPn.FLORICA 33608 URLANDO, FLORIDA 32802 PENSACOLA FLORICA 325e2 TALLAHASSEE, FLORIDA 32303 (8:3) 323 5366 (305) 049-0300 (904) 434-0143 (904) 224-a ses PLEASE RE.*LY TC, FREEDOM OF INFORMATION ACT REQUEST _ Tampa June 15, 1981 FREEDOM OF INFORMATION ACT REQUEST Director', Office of Administration U. S. Nuclear Regulatory Commission Q ,

Washington, D. C. 20555

Dear Sirs:

Pursuant to the-Freedom of Information Act, 5 USC, Section 552, and 10 C.F.R. Section 9.8, we request that you send us copies of the fcllowing documents (the term " documents" means any writing, however produced or reproduced, such as notes, tests, reports, de-signs, diagrams, correspondence, interagency or intra-agency mem-orarda, investigatory records , testimony, minutes of meetings, etc.) :

s (1) All documents sent to or received from the Babcock & Wilcox Company ("B & W") , Florida Power Corporation ("FPC"), the Nuclear Regulatory Commission or its predecessor, the Atomic Energy Com-mission, which relate to, comment on or evidence the following:

a) the design and integrity of the core conponents of the Crystal River Unit 3 Nuclear Plant (" Crys tal River") and the adequacy thereof, at the pre and post-licensing stages, b)- the design and integrity of the burnable poison rod assemblies and fuel assemblies (as used in this letter the terms burnable poison red assemblies and fuel assemblies mean each such as-sembly in its entirety and each and every part thereof) sup-plied by B & W at Crystal River and the adequacy thereof at the pre and post-licensing stages and any post-licensing changes in the design of such assemolies proposed or considered by B & W and the reasons therefor, c) the design and integrity of the burnable poison rod assembliec and the fuel . assemblies supplied by B & W at any nuclear facility other than Crystal River and the adequacy thereof at the pre and post-licensing stages and any post-licensing changes in the de-sign of such assemblies proposed or considered by B & W, and the ,

reasons therefor, 8107230244 810615 '

PDR FOIA BROWN 81-236 PDR.:

r- < , .

Page Two Director,0ffice of Administration ~

U.S. Nuclear. Regulatory Commission l June 15, 1981

' d) the design and int'egrity of burnable poison rod assemblies supplied by any manufacturer:other than B & W at nuclear facilities other than-Crystal River and the adequacy thereof at the pre and post-licensing stages and any post-licensing changes in the design of such assemblies proposed or con-sidered by such manufacturer and the reasons therefor.

.e) the facts or assumptions upon which Sections 3.2.4.2.1 (titled

. Fuel Assemblies) ; 3.2.4.2.4 -(titled Burnable Poison Rod Assembly) and 3.2.4.2.5 (titled Orifice Rod Assembly) of the Final Safety Analysis Report for Crystal River are. based,.

f):

~

the cause of the shutdown of a reactor coolant pump at Crystal River on February. 17,'1978 including but not limited to the cause of the disengagement'and/or- ejection of the burnable poison

. rod assemblies and the cause of the shutdown at Crystal River on March:3,fl978,

g) the relationship between the flow characteristics, flow conditions and hydraulic forces of the nuclear steam system at Crystal River

~

and .the burnable poison rod assemblies and fuel assemblies con-tained in that system.

(2) To the extent not supplied in response to other requests in this

. .. letter,'the following. reports: LTopical Report BAW-10037 " Reactor

> Vessel Model Flow Tests"-and Topical Report BAW 10038 " Vibration
Analysis _and Preoperational Test Program for 177- Fuel Assembly Proto-

[ _ type Reactor Internals", both referenced in the Final Safety Analysis

[ Report ~for Crystal River. ,

(3) . Alludocuments which relate to, comment on or evidence any shut-1 down,- failure. or other difficulty - involving burnable poison rod

assembliesi supplied-by B & W at nuclear facilities other than Crystal River on or before February 17, 1978.

p -(4) All documents which relate to, comment on or evidence any sh _tt-

! ~ downg : failure or other difficulty involving burnable poison rod as-1 semblies at nuclear facilities' other than Crystal River whether or

.not'such - assemblics ware supplied by B & W.

. (5)- All docwr.ents which relate to, comment on, or evidence any shut-L down, failure ~or other difficulty at any nuclear facility other than

f. Crystal River Unit 3 in which loose parts in the nuclear steam system L -

entered, or were said to enter, a steam generator.

SYou are authorized to incur, and we will pay, fees for search and ,

duplication upito and including' $500.00, without further author-l1zation on our part. However, 'if you estimate the fees required to L - ' comply with_chis request are likely to exceed $500.00, please tele-

[ phone me (collect) prior to complying with chis request.

M

~

~Q

, ; 4 - y-Page.Throu

'- Director, Office of Administration LU. S. Naclear Regulatory Commission. '

June 15, 1981-If there is any delay in complying with any of the above-enumerated requests , please forward ~the ' other materials requested as soon 'as possible prior to complying with the requests that will involve some delay.

If you believe some parts of a file are exempt from release, please provide me with all "reasonebly segregable" portions of the requested information which-are not exempt and please advise me as to which exemption you believe covers the material which you are not releasing.

Thank' you very much for your time and assistance with this matter.

If you have any questions regarding this request, please telephone me -(collect) .

Very truly yours, d N. -

Mark A. Brown MAB/cks Certified Mail Return Receipt Requested a