ML20009C716
| ML20009C716 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/30/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wells D DETROIT EDISON CO. |
| Shared Package | |
| ML20009C713 | List: |
| References | |
| NUDOCS 8107210392 | |
| Download: ML20009C716 (1) | |
Text
a
.\\
Detroit Edison Company g gggt basis which it is claimed that the information should be withheld from public disclosure.
This sec. ion further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, a copy of this letter, the enclosures, and your response to this Ietter will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely, S. $. Y MA
's C. E. Morelius, Acting Director Division of Engineering and Technical Inspection
Enclosures:
1.
Appendix A, Notice of Violation 2.
IE. Inspection Report No. 50-341/81-07 cc w/encls:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney I
8107210392 810717 PDR ADOCK 05000341 G