Docket Nos. 50-361/362
}gjh}%g s %%
n f
Southern California Edison Company
$mC P. O. B OX 8 00 g
2 2 44 W ALNUT GROVE AVENUE ROSEM E AD, CALt FORNI A 91770 K.P.BASKIN ttLeewohr
"" ~ ^ l "$ '."'~'o' ' "c ' Ul~~," " '" -
July 7,1981 U. S. Nuclear Regulatory Commission y
Region V p
f.
% j'\\f,g Seite 202, Walnut Creek Plaza x
[h N
\\
1990 North California Boulevard i
7 e
Walnut Creek, California 95696 Attention:
R. H. Engelken, Director
//
{;i Gentlemen:
Subject:
,c' Docket Nos. 50-361 and 50-362 San Onofre Nuclear Generating Station Units 2&3
References:
A.
Lutter, SCE to NRC dated November 25, 1980; subject,Dacket Nos. 50-361 and 50-362, SONGS 2&3 B.
Letter, SCE to NRC dated December 23, 1980; subject, Docket Nos. 50-361 and 50-362, SONGS 2&3 C.
Letter, SCE to NRC dated January 28, 1981; subject, Docket Nos. 50-361 and 50-362, SONGS 283 The subject document, forwarded by NRC letter dated April 9,1981, describes testing which indicates that a number of gate type motor-operated valves (as identified in the bulletin) failed to fully close under conditions that approximated those of the valves'intcoded service. Construction permit holders were requested to ascertain whether any of the subject valves are or were to be installed in safety-related systems or as PORV block valves and if so, complete the recommended corrective action.
SCE has determined, through information provicbd by both the S023 A/E and NSSS vendor, that only two (2) of the subject valves (ene per unit-tag numbers 2&3 TV-9267 supplied by Westinghouse) have been utilized at S023.
Reports submitted to the NRC in accordance with 10 CFR 50.bb(e) (References A, B, and C) provided notification of the use of thsG valves, the information subsequently requested by Bulletin Item 4 for Construction Permit hciders, and gg a propred corrective action (replacement of the motor actuator and yoke with an assembly capable of meeting S023 requirements). SCE has been notified by 3
the S023 A/E that the corrective action proposed in Reference C has been completed.
8107210341 810707
.PDR ADOCK 05000361 0
PDR S'/-//E
y e b R. H. Engelken, Director July 7, 1981 Should you have any questions or require additional clarification, please contact me.
Subscribed on this J (1ay of _
1981.
Ver ru
- yours, SOUTHERN CALIFORNIA EDIS0N COMPANY By
/u' K. P. Baskin
.bnager of Nuclear Engineering, Safety, and Licensing Subscrib and Sworn tg before me on this 7 day of
/
, 1981 P
l
[
l AGNES CRABTREE d i
I
' NOTARY RJBUC - CAttFOPW Lt l
IWINCIPAL ornCE IN p
6 ll LOS ANGELES COUNTY j
I l----
I *E*N N