Forwards IE Insp Rept 50-295/81-08 on 810409,15-17 & 0624-26.No Noncompliance Noted
ML20009C596
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 07/10/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20009C598 List:
References
NUDOCS 8107210252
Download: ML20009C596 (2)


See also: IR 05000295/1981008

Text

. /* ]C%g

4#

o

UNITED STATES

sJ'

NUCLEAR REGULATORY COMMISSION

'

),q

g

'

.s

REGION 111

'

o,,

,f

799 ROOSEVELT ROAD

D

o

GLEN ELLYN, ILLINots 60137

% .' .%

...

31 I E

g hlif/f9,

ss-

Docket No. 50-295

,,

1981

Commonwealth Edison Company

(' 9

1.

JUL 20

22

ATTN:

Mr. Cordell Reed

(

g,,o:gj[,

Vice President

'f

7

Post' Office Box 767

-

Chicago, IL 60690

Q

Gen *.lemen:

This refers to the routine safety inspection conducted by Mr. D. L. Robinson

of this office on April 9, 15-17, June 24-26, 1981, of activities at the

Zion Nuclear Power Station, Unit 1, authorized by NRC Operating License

No. DPR-39 and to the discussion of our findings with Mr. K. L. Graesser

and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and-the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

i

days from the date of this letter of your intention to file a request for

l

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

l

identifies the document or part sought to be withheld, and which contains

l

a full statement of the reasons on the basis which it is claimed that the

l

information should be withheld from public disclosure. This section further

l

requires the' statement to address with specificity the considerations listed

l

,

Tho/

s

Ifl

i

0107210252 810710

PDR ADOCK 05000295

,

O

PDR

!

-.

..__ _

- - -

. .

,

-

. .

-

-

.

-

.-

--

'

.

,

4

Commonwealth Edison Company

-2-

  • W

'-

. . , ,

.

.

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this lettee and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-295/81-08

cc w/ encl:

J. S. Abel, Director

of Nuclear Licensing

K. Graesser, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

.