ML20009C552
| ML20009C552 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 06/23/1981 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20009C553 | List: |
| References | |
| NUDOCS 8107210221 | |
| Download: ML20009C552 (2) | |
See also: IR 05000344/1981012
Text
FOR DCS PROCESSING
,
famuy
Original document not available
h
UNITED STATES
to NRC
r
j
[
}
NUCLEAR REGULATORY COMMISSION Certified by j tf 7)cge N
3
c
REGION V
?
1990 N. CALWORNIA BOULEVARD
[)A/ g-g
,o'
SUITE 202, WALNUT CREEK PLAZA
- r,,,*
WALNUT CREEK, CALIFORNIA 94596
June 23, 1981
Docket No. 50-344
fq,
v-
i~
f
l/
b( \\\\{
3
't
- p \\\\
b
Portland General Electric Company
197 7
121 S. W. Salmon Street
i
' #g\\p# ;3
jul 3
Portland, Oregon 97204
6,
-
1
Attention:
Mr. Bart D. Withers
Vice President - Nuclear
Gentlemen:
Subject: NRC Inspection
This refers to the inspection conducted by Mr. G. Yuhas and Mr. E. Garcia
of this office on May 11-15, 1981 of activities authorized by NRC License
No. NPF-1, and to the discussion of our findings held by Mr. G. Yuhas with
Mr. B. D. Withers and other members of your staff at the conclusbn of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
With respect to Item A of the Notice of Violation, no response is required in view
of the timely manner in which you identified the problem and implemented measures to
prevent recurrence. We have no further questions on that matter.
In accordance with 10 CFR 2.790 of 'he Commission's regulations, a copy
of this letter and the enclosed 'nsr action report will be placed in the
NRC's Public Document Room.
If i h's report contains any information that
you (or your contractors) bel >v , tu be exempt from disclosure under 10 CFR 9.5(a)(4), it is necesse f
J nJ (a) notify this office by telephone
within ten (10) days from che da u
this letter of your intention to file
'
a request for withholdino and (b) submit within 25 days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven
Iggf
(7) days are available for your review. Mease notify this office promptly
so that a new due date may be est a Laed.
Consistent with section 2.790
J
(b)(1), any such application must be accompanied by an affidavit executed
, /,
by the owner of the information which identifies the document or part sought
'/I
to be withheld, and which contains a full statement of the basis on which
it is claimed that the information should be withheld from public disclosure.
8107210221 810623
PDR ADOCK 05000344
O
.
.
.
.
Portland General Electric Company
-2-
June 23, 1981
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). -The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
Rws
, G. S. Spencer, Director
Division of Technical Inspection
Enclosures:
A.
8.
IE Inspection Report
No. 50-344/81-12
cc w/o enclosure B:
C. P. Yundt, PGE
J. W. Durham, Esq., PGE