ML20009C362

From kanterella
Jump to navigation Jump to search
Forwards LER 81-003/01T-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009C362


LER 81-003/01T-0:on 810226,B Steam Generator Was Pressurized to 550 Psig.Caused by Procedural Deficiency. Once-through Steam Generator Pressure Lowered.Procedures for Opening Startup Block Valves Will Be Revised
ML20009C368
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/12/1981
From: Jackie Jones
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C368 (1)
Forwards LER 81-003/01T-0.Detailed Event Analysis Encl
ML20009C361
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/12/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C361 (2)