ML20009C332

From kanterella
Jump to navigation Jump to search
Forwards LER 81-036/01T-1.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009C332


LER 81-036/01T-1:on 810414,during Mode 3 Failure of One Seal of Lower & Upper Personnel Air Lock Occurred.Caused by Pressure Exceeding 55 Psi & Door Not Properly Aligned.Seal Inflation Reduced & New Seals Installed
ML20009C341
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 04/28/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C341 (1)
Forwards LER 81-036/01T-1.Detailed Event Analysis Encl
ML20009C331
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/05/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C331 (3)