ML20009C237

From kanterella
Jump to navigation Jump to search
Forwards LER 81-052/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009C237


LER 81-052/03L-0:on 810412,while in Mode 3,upper Head Injection Diaphragm Between water-filled & Nitrogen Bearing Accumulators Was Ruptured.Caused by Procedural Deficiency. Procedure Modified.Diaphragm Will Be Replaced
ML20009C243
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/12/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C243 (1)
Forwards LER 81-052/03L-0.Detailed Event Analysis Encl
ML20009C235
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/12/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C235 (3)