ML20009C207

From kanterella
Jump to navigation Jump to search
Forwards LER 81-053/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009C207


LER 81-053/03L-0:on 810413,during Mode 3 Initial Fuel Loading,Liquid from Ventilation Unit Condensation Drain Tank Was Released Into Condenser Discharge W/O Prior Analysis. Caused by Deficient Procedure.Procedure Has Been Rewritten
ML20009C210
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/13/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C210 (1)
Forwards LER 81-053/03L-0.Detailed Event Analysis Encl
ML20009C206
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/13/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C206 (3)