ML20009C117

From kanterella
Jump to navigation Jump to search
Forwards LER 81-001/03X-1.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009C117


LER 81-001/03X-1:on 810120,discovered That Low Pressure Svc Water Was Not Flowing to HPI Pump 2A.Caused by Blockage Due to Crud Buildup.Portions of Carbon Steel Piping Will Be Replaced W/Stainless Steel
ML20009C122
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/19/1981
From: Jackie Jones
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C122 (1)
Forwards LER 81-001/03X-1.Detailed Event Analysis Encl
ML20009C116
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/19/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C116 (2)