ML20009C080

From kanterella
Jump to navigation Jump to search
Forwards LER 81-040/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009C080


LER 81-040/03L-0:on 810405,while in Mode 4,initial Fuel Loading,Pressure Gauges a & D Indicated Pressure W/No Actual Pressure in Steam Lines.Caused by Faulty Transmitters. Transmitters Replaced,Tested & Calibr
ML20009C081
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/05/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C081 (1)
Forwards LER 81-040/03L-0.Detailed Event Analysis Encl
ML20009C079
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/05/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C079 (3)