Enclosure to Serial: RSEP/81-1120 a
o I
Page 1 of 4
(
OPERATING DATA REPORT DOCKET NO.
DPR-23 DATE 810701 i
C05tPLETED BY R W t-f nrd TELEPilONE 803-383-4524 OPERATING STATUS H. B. Robinson Unit Two Notes
- 1. Unit Name:
- 2. Reporting Period:
810601,0000 / 810630.2400 There are presently 113
- 3. Licensed Thermal Power tilWr): 2300 spent fuel assemblies in 739 the spent fuel pit.
- 4. Nameplate Rating (Gross 5the):
700
- 5. Design Electrical Rating (Net SIWE):
700
- 6. Staximum Dependable Capacity (Gross Slwe):
665
- 7. Ma.simum Dependable Capacity (Net SlWep:
- 5. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
No chance.
- 9. Power Level To Which Restricted. If Any INet SIWE): 2200 MWt
- 10. Reasons For Restrictions.lf Any: Although the unit is not restricted by any outside acency. the nower level is nresentiv reduced to 2200 MWt due to steam
_ generator considerations.
This 31onth Yr.-to-Date Cumulatise
- 11. Ilours in Reporting Pesiod 720 4343 90.509
- 12. Number Of flours Reactor Was Critical 455.39 3589.94 69,355.22 l3. Reactor Reserve Shutdown llours 9.67 107.42 1085.30
- 14. Hours Generator On.Line 443.68 3508.90 67,667.72
- 15. Unit Reserse Shutdoa n flours 0.00 0.00 23.20
- 16. Gross T' ermal Energy Generated iN!Wil) 877,655 7,560,012 138.772.386
- 17. Gross Electrical Energy Generated OlWil) 256.412__,,
2,424,327 44,763,094 l
- 18. Net Elterrical Energy Generated (31Will 239.855 2.297.966 42,414,418
- 19. Unit Service Factor 61.62 80.79 74.76 l
- 20. Unit Availabilit3 actor 61.62 80.79 74.79 50.10 79.57 70.47
- 21. Unit Capacity Factor (Using SIDC Net, 47.59 75.59 66.95
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
&J7 5.27 13.46
(
- 24. Shutdowns Scheduled Oser Nest 6 5tonths iType. Date.and Duration of Eachi.
Refueling / Maintenance - November 14, 1981 - 3 Months
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
On line.
- 26. Units in Test Status (Prior Io Commercial Operationi:
Forecast Achiesed INITI\\l.CR!T C ti!TV Initial Electricity Commercial Operation of[$21 D
DO PDR w~^
3 Page 2 of 4 i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
DPR-23 H. B. Robinson Two UNIT DATE COMPLETED BY M. Watford 803-383-4524 TELEPHONE MONTH June, 1981 DAY AVERAGE DAILY PO'WER LEVEL DAY AVER AGE DAILY POWER LEVEL -
1MWe-Nt t)
(ywe. Net )
0 1
17 587 2
0 3
559 3
0 402 g9 0
161 20 5
0 285
- i 6
0 2;
511
.547 7
0 23 8
0 542 24 9
0 25 562 10 0
26 561 1
II
$4 566 27 12 563 571 23 13 609 580 29 607 585 34 30 610 15 3
16 604 INSTRUCTIONS On this format. list the average dady unit power leselin MWe-Net for each day in th reporting month. Compute to
- the nearest whole rnegawatt.
,,n s.msh 3,'w j i
' au.... '~5ss: w w::s.s
+,
.,_~~~-_m.
m.
. _.. - _ _.... ~, _,,,..
._ __.-_.-,..... m_
...-_____._.,,,____.m_,_,,._
m
..,-,,,,-_.m.-7
_ yj Page 3 of 4
. i; UNIT SHU1 DOWNS AND POWER REDUCTIONS D0CKET NO. DPR-23 UNIT NAME H.
B. Robinson Two 3
DATE 810702 June COMPl.ETED BY M. L. Watford j
REPORT MONTil TELEPHONE 803-383-4524
- )
A I
'd q
}E h
Y I. ice'Isee
,E t, p.?
L Cause & Corrective No.
Date g
3g
(
,;; y$
Event gg Action to Prevent Recurrence l
H
}'
jE 5
j 5 Repori n mV d
6 05-01 810516 S
255.37 D
1 CC HTEXCH Continuation from last month.
Shut-i down for S/G tube inspection and l
plugging as required per inspection.
06-01 810619 F
11.58 H
2 HA GENERA Turbine run-back due to lighting hitting unit, resulting in operator manually tripping the unit as a precautionary safety measure.
06-02 810620 F
9.67 H
3 IB CKTBRK Unit trip due to instrument buss spike caused while I6C personnel were replacing safeguard test switch.
06-03 810620 F
A 4
HH CKTBRK Load reduction. Condensate pump micro switch failed preve.' ting utart function.
Switch was repleced.
I 2
3 4
F: I orced Reason :
Method:
INlubit G Jnstructions S: Scheduled A liguipment I aihue il xplain)
- 1. Manual for Preparation of Data ll41aintenance or lest 2-Manual Serarn.
1;ntry Sheets for 1.icensee C.Refuehng 3-Autoinatic Suam.
Event Report (l.I:RI File (NilRI G-D Regulatory Restriction 4 Other (ISplain) 0161)
- l. Opcialor Itaining & ljcense I xamination I'- Adininist ra tive 5
G Operational I iros (l'xplain)
Exhibit ! Sam,' Source l'7/77) iI 01her (INplain) 4
Enclosure to Serial-RSEP/81-1120 Page 4 of 4 OPERATING DATA REPORT
- CORRECTED COPY DOCKET NO: DPR-23 DATE: 810602 COMPLETED BY:
M. _ L. Wa t fo rd TELEPHONE: 803-383-4524 OPERATING STATUS Notes:
- 1. Unit Name:
H. B. Robinson Unit Two
- 2. Reporting Period:,810501, 0000/810531,_2400 There are presently 113 spent fuel
- 3. Licensed Thermal Power (FMt): 2300 assemblies in the spent fuel pit.
- 4. Nameplate Rating (Cross MUe): 739
- 5. Design Electrical Rating (Net FMe): 700
- 6. Maximum Dependable Capacity (Gross FMe): 700
- 7. Maximum Dependable Capacity (Net MWe):
665
- 8. If Changes Occur in Capacity Ratings (ltem Number 3 through 7) Since Last Report, Give Reasons: No change
- 9. Pouer Level to Which Restricted, If Any (Net MWe): 2200 IMt
- 10. Reasons For Restrictions, If Any: Althquch the unit is not restricted by any outside
_pgency. the newer level is nresentiv reduced to 2200 MWt due to Steam Generator considerations.
This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 744 3623 89.789
- 12. Number of Hours Reactor Was Critical 360.30 3134.55.,_
68.899.83
- 13. Reactor Reserve Shutdown Hours 0.00 97.75 1.075.63
- 14. Hours Generator On-Line 360.05 3065.22 67.224.04
- 15. Unit Reserve Shutdown Hours 0.00 0.00 23.20
- 16. Gross Thermal Energy Generated (MWH) 795.128 6.682.357 137.894.731
- 17. Gross Electrical Energy Generated (Mul) 251.222
_2,167,915
. 44,506,682
- 18. Net Electrical Energy Generated (MWil) 236.497 2,058.111 42,174,563
- 20. Unit Availability Factor 48.39 84.60 74.87
- 19. Unit Service Factor 48.39 84.60 74.89
- 21. Unit Capacity Factor (Using MDC Net) 47.80 85.42 70.63 l
- 22. Unit Capacity Factor (Using DER Net) 45.41 81.15 67.10 l
- 23. Unit Forced Outage Rate 0.00 5.37 13.51 l
- 24. Shutdowns Scheduled Over Next 6 bbnths (Type, Date, and Duration of Each):
l Refueling / Maintenance - November 14, 1981 - 3 Months l
- 25. If Shut Down At End of Report Period, Estimated Date of Startup: June 10, 1981
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY ComERCIAL OPERATION I
i l
i (9/77) j sg
_.