a o Enclosure to Serial: RSEP/81-1120 I Page 1 of 4 (

OPERATING DATA REPORT DOCKET NO. DPR-23 DATE 810701

  • i C05tPLETED BY R W t-f nrd TELEPilONE 803-383-4524 OPERATING STATUS .
1. Unit Name: H. B. Robinson Unit Two Notes
2. Reporting Period: 810601,0000 / 810630.2400 There are presently 113 spent fuel assemblies in
3. Licensed Thermal Power tilWr): 2300 739 the spent fuel pit.
4. Nameplate Rating (Gross 5the):
5. Design Electrical Rating (Net SIWE): 700
6. Staximum Dependable Capacity (Gross Slwe): 700
7. Ma.simum Dependable Capacity (Net SlWep: 665
5. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:

No chance.

9. Power Level To Which Restricted. If Any INet SIWE): 2200 MWt
10. Reasons For Restrictions.lf Any: Although the unit is not restricted by any outside acency. the nower level is nresentiv reduced to 2200 MWt due to steam

_ generator considerations.

This 31onth Yr.-to-Date Cumulatise

11. Ilours in Reporting Pesiod 720 4343 90.509
12. Number Of flours Reactor Was Critical 455.39 3589.94 69,355.22 l3. Reactor Reserve Shutdown llours 9.67 107.42 1085.30
14. Hours Generator On.Line 443.68 3508.90 67,667.72
15. Unit Reserse Shutdoa n flours 0.00 0.00 23.20
16. Gross T' ermal Energy Generated iN!Wil) 877,655 7,560,012 138.772.386

, 17. Gross Electrical Energy Generated OlWil) 256.412__,, 2,424,327 44,763,094

18. Net Elterrical Energy Generated (31Will 239.855 2.297.966 42,414,418 l
19. Unit Service Factor 61.62 80.79 74.76 l 20. Unit Availabilit3 actor 61.62 80.79 74.79
21. Unit Capacity Factor (Using SIDC Net, 50.10 79.57 70.47
22. Unit Capacity Factor (Using DER Net) 47.59 75.59 66.95
23. Unit Forced Outage Rate &J7 5.27 13.46

( 24. Shutdowns Scheduled Oser Nest 6 5tonths iType. Date.and Duration of Eachi. -

Refueling / Maintenance - November 14, 1981 - 3 Months

25. If Shut Down At End Of Report Period. Estimated Date of Startup: On line.
26. Units in Test Status (Prior Io Commercial Operationi: Forecast Achiesed INITI\l.CR!T C ti!TV _..__ __

Initial Electricity -- --

Commercial Operation -- --

D DO of[$21 PDR - w~^

- 3 Page 2 of 4 i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. DPR-23 UNIT H. B. Robinson Two DATE COMPLETED BY M. Watford TELEPHONE 803-383-4524 MONTH June, 1981 DAY AVERAGE DAILY PO'WER LEVEL DAY AVER AGE DAILY POWER LEVEL -

1MWe-Nt t) (ywe. Net )

0 587 1 17 2 0 3 559 3 0 g9 402 0 161 20 5 0 ;i 285 6 0 2; 511 7 0 23 .547 8 0 24 542 9 0 25 562 1 10 0 26 561

! II $4 27 566 12 563 23 571 13 609 29 580 _

34 607 585 30 610 15 3 16 604 INSTRUCTIONS On this format. list the average dady unit power leselin MWe-Net for each day in th reporting month. Compute to

- the nearest whole rnegawatt.

- , . . , ,n s.msh i 3,'w j

' au .... '~5ss: w w::s.s

+, .,_~~~-_m. . _ . . - _ _ . . . . ~ , _ , , , . . ._ __.-_.-, ..... m_ ...-_____._.,,,____.m_,_,,._ m ..,-,,,,-_.m.-7 . . . - -

_ yj Page 3 of 4 ,,

. i; UNIT SHU1 DOWNS AND POWER REDUCTIONS D0CKET NO. DPR-23 UNIT NAME H. B. Robinson Two 3 DATE 810702  ;

June COMPl.ETED BY M. L. Watford j REPORT MONTil .

TELEPHONE 803-383-4524 ,,

)
A I

'd q

-, }E h Y I. ice'Isee ,E t, L p.?

Cause & Corrective

! No. Date g 3g ( ,;; y$ Event gg Action to ..

l H jE 5 j5 Repori n mV

}' Prevent Recurrence d

, 6 05-01 810516 S 255.37 D 1 --

CC HTEXCH Continuation from last month. Shut-i down for S/G tube inspection and plugging as required per inspection.

l 06-01 11.58 810619 F H 2 --

HA GENERA Turbine run-back due to lighting hitting unit, resulting in operator manually tripping the unit as a precautionary safety measure.

06-02 810620 F 9.67 H 3 --

IB CKTBRK Unit trip due to instrument buss spike caused while I6C personnel were replacing safeguard test switch.

06-03 810620 F --

A 4 --

HH CKTBRK Load reduction. Condensate pump micro switch failed preve.' ting utart function. Switch was repleced.

I 2 3 4 F: I orced Reason : Method: INlubit G Jnstructions S: Scheduled A liguipment I aihue il xplain) 1. Manual for Preparation of Data ll41aintenance or lest 2-Manual Serarn. 1;ntry Sheets for 1.icensee C.Refuehng 3-Autoinatic Suam. Event Report (l.I:RI File (NilRI G-D Regulatory Restriction 4 Other (ISplain) 0161)

, l. Opcialor Itaining & ljcense I xamination I'- Adininist ra tive 5 G Operational I iros (l'xplain)

. Exhibit ! Sam,' Source l'7/77) iI 01her (INplain) 4

. ., Enclosure to Serial- RSEP/81-1120 Page 4 of 4 OPERATING DATA REPORT

  • CORRECTED COPY DOCKET NO: DPR-23 DATE: 810602 COMPLETED BY: M. _ L . Wa t fo rd TELEPHONE: 803-383-4524 OPERATING STATUS Notes:
1. Unit Name: H. B. Robinson Unit Two
2. Reporting Period:,810501, 0000/810531,_2400 There are presently 113 spent fuel
3. Licensed Thermal Power (FMt): 2300 assemblies in the spent fuel pit.
4. Nameplate Rating (Cross MUe): 739
5. Design Electrical Rating (Net FMe): 700
6. Maximum Dependable Capacity (Gross FMe): 700
7. Maximum Dependable Capacity (Net MWe): 665
8. If Changes Occur in Capacity Ratings (ltem Number 3 through 7) Since Last Report, Give Reasons: No change
9. Pouer Level to Which Restricted, If Any (Net MWe): 2200 IMt
10. Reasons For Restrictions, If Any: Althquch the unit is not restricted by any outside

_pgency. the newer level is nresentiv reduced to 2200 MWt due to Steam Generator considerations.

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 744 3623 89.789
12. Number of Hours Reactor Was Critical 360.30 3134.55.,_ 68.899.83
13. Reactor Reserve Shutdown Hours 0.00 97.75 1.075.63
14. Hours Generator On-Line 360.05 3065.22 67.224.04
15. Unit Reserve Shutdown Hours 0.00 0.00 23.20
16. Gross Thermal Energy Generated (MWH) 795.128 6.682.357 137.894.731
17. Gross Electrical Energy Generated (Mul) 251.222 _2,167,915 . 44,506,682
18. Net Electrical Energy Generated (MWil) 236.497 2,058.111 42,174,563
19. Unit Service Factor ___

48.39 84.60 74.87

20. Unit Availability Factor 48.39 84.60 74.89 *
21. Unit Capacity Factor (Using MDC Net) 47.80 85.42 70.63 l 22. Unit Capacity Factor (Using DER Net) 45.41 81.15 67.10 l 23. Unit Forced Outage Rate ___

0.00 5.37 13.51 l 24. Shutdowns Scheduled Over Next 6 bbnths (Type, Date, and Duration of Each):

l Refueling / Maintenance - November 14, 1981 - 3 Months l 25. If Shut Down At End of Report Period, Estimated Date of Startup: June 10, 1981

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY - -

INITIAL ELECTRICITY - -

ComERCIAL OPERATION - -