[>= ag'o
.
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
~
n
U
.E
REGION 111
k
[
799 ROOSEVELT ROAD
g
/
GLEN ELLYN,ILUNOIS 60m
"JUL
6 1981
e
to.
To
O
Docket No. 50-454
t
p
Docket No. 50-455
3
1
y-.
2~
J{J .2 6 /
-
Commonwealth Edison Company
C
44
-
/A
rog &((8
ATTN:
Mr. Cordell Reed
g
,
Vice President
Post Office Box 767
Y
Chicago, IL 60690
g
hg
=
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward
of this office on Mzy 26-27 and June 24-25, 1981, of activities at Byron
Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-130
and No. CPPR-131 and to the discussion of our findings with Mr. M. Stanish
and others at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a ccpy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information that
you or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within seven (7) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office tc
withhold such information.
Section 2.790(b)(1) requires that any such
application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it
is claimed that the information should be withheld from public disclosure.
I
8107170184 810706
PDR ADOCK 05000454
o
,
'
.
.
JUL
0 I30l
"
Commonwealth Edison Coupany
-2-
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
$.$.
N
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosure:
IE Inspection
Reports No. 50-454/81-05
and No. 50-455/81-05
cc w/ enc 1:
J. S. Abel, Director
of Nuclear Licensing
Gunner Sorensen, Site
Project Superintendent
V. I. Schlosser,
Project Manager
R. E. Querio, Station
Superintendent
DMB/ Document Contorl Desk (RIDS)
Mary Jo Murray, Office of
Assistant Attorney General
Myron M. Cherry
- . _ _ - _ . ,
- .
- _ _ ... .
-
.-- ,
.
-
-
-.. -
.-.
-