Forwards IE Insp Repts 50-454/81-05 & 50-455/81-05 on 810526-27 & 0624-25.No Noncompliance Noted
ML20009B803
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/06/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20009B804 List:
References
NUDOCS 8107170184
Download: ML20009B803 (2)


See also: IR 05000454/1981005

Text

.

[>= ag'o

.

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

~

n

U

.E

REGION 111

k

[

799 ROOSEVELT ROAD

g

/

GLEN ELLYN,ILUNOIS 60m

"JUL

6 1981

e

to.

To

O

Docket No. 50-454

t

p

Docket No. 50-455

3

1

y-.

2~

J{J .2 6 /

-

Commonwealth Edison Company

C

44

-

/A

rog &((8

ATTN:

Mr. Cordell Reed

g

,

Vice President

Post Office Box 767

Y

Chicago, IL 60690

g

hg

=

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward

of this office on Mzy 26-27 and June 24-25, 1981, of activities at Byron

Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-130

and No. CPPR-131 and to the discussion of our findings with Mr. M. Stanish

and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a ccpy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information that

you or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within seven (7) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office tc

withhold such information.

Section 2.790(b)(1) requires that any such

application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons on the basis which it

is claimed that the information should be withheld from public disclosure.

SI

I

8107170184 810706

PDR ADOCK 05000454

o

PDR

,

'

.

.

JUL

0 I30l

"

Commonwealth Edison Coupany

-2-

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

$.$.

N

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Reports No. 50-454/81-05

and No. 50-455/81-05

cc w/ enc 1:

J. S. Abel, Director

of Nuclear Licensing

Gunner Sorensen, Site

Project Superintendent

V. I. Schlosser,

Project Manager

R. E. Querio, Station

Superintendent

DMB/ Document Contorl Desk (RIDS)

Mary Jo Murray, Office of

Assistant Attorney General

Myron M. Cherry

- . _ _ - _ . ,

- .

- _ _ ... .

-

.-- ,

.

-

-

-.. -

.-.

-