ML20009B500

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-1100/81-03 on 810225-27 & Notice of Violation
ML20009B500
Person / Time
Site: 07001100
Issue date: 05/15/1981
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Litchtenberger
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20009B501 List:
References
NUDOCS 8107160162
Download: ML20009B500 (2)


Text

- -

l0A a

f, M%q#o UNITED STATES g

E NUCLEAR REGULATCRY COMMISSION o

O E

REGION I 8,

[

631 PARK AVENUE KING OF PRUSSIA. PENNSYLVANIA 19406 Docket No. 70-1100 15 MAY 1981 Combustion Engineering, Inc.

ATTN: Mr. H. V. Lichtenberger Vice President. Nuclear Fuel Nuclear Power Systems - Manufacturing P. O. Box 500 Windsor, Connecticut 06095 Gentlemen:

Subject:

Inspection 70-1100/81-03 This refers to the routine safety inspection conducted by Mr. P. Clemons of this office on February 25-27, 1981 of activities authorized by NRC License No. SNM-1067 and to the discussions of our findings held by Mr. Clemons with you and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which S enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your activi-ties were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into the levels described in the Federal Register Notice (45 FR 66754) dated October 7, 1980.

You are required to respond to this letter and in preparing your response, you should follow the instructions in Appendix A.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.

If this report contains any infor-mation that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to th'is office to withhold such information from public disclosure. Any such application must be accompanied by an affidavit exec asd by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement of reasons which addresses with specificity the items which will be considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

8107160162 810515 PDR ADOCK 07001100 C

PDR

a l

Combustion Engineering, Inc.

2 15 MAY 1961 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, gl.r;tco /.*

'Ojk W

(,JimesH.Joyner;shie[, Technical Inspection Branch, Division of Engineering and Technical Inspection i

Enclosures:

1.

Appendix A, Notice of Violation 2.

Office of Inspection and Enforcement Inspection Report Number 70-1100/81-03 k

4 g -

y

, _ _ _ _ _ -