Forwards 810702 Directors Decision 81-12 Under 10CFR2.206, Denying Request That NRC Reconsider Decision to Issue Facility Cps.Also Forwards Fr Notice of Issuance
ML20009B097
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/02/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Flack G
GEORGIANS AGAINST NUCLEAR ENERGY
Shared Package
ML20009B098 List:
References
DD-81-12, NUDOCS 8107140780
Download: ML20009B097 (3)


Text

i Docket Nos.:

50-424 and 50-425 Mr. Gary Flack, Esq.

1515 Healey Building 57 Forsyth Street, N. W.

Atlanta, Georgia 30303

Dear Mr. Flack:

On September 25, 1980, you requested on behalf of Georgians Against P uclear Eneroy (GAHE) that the Nuclear Regulatory Comission reconsider it'. decision to issue construction pemits to Georgia Power Corrany for the construction of the two Vogtle nuclear facilities. As a basn, of its request, GAME cited an electricity demand forecast subritted by GPC to the Georgia Public Service Comission. According to GAHE, this forecast indicates that upon cor'pletion of the tuo Vogtle facilities, GPC will have greater excess reserve generating capacity than was origina'llyanticipated in the initial construction remit proceedi ng.

GANE asserts that this inforration regarding excess capacity constitutes new infomation not previously considered by the NRC.

GANE's petition has beer treated under 10 CFR S 2.206 of the Comisrion's regulations. Upon revim of GANE's filings and of other relevant infomation, I have deterr. lined to deoy the request. The reasons for this decision are fully discussed in the enclosed " Director's Decision under 10 CFR 52.206."

Also ec-losed is a copy of a Federal Register Notice renardinn this decisinn that ~. 5 being filed with the Office of the Federal Register.

A copy of this decision will be placed in the Comission's Public Deccent

(

Room at 1717 H Street, H. M., Washington, D. C.

20555 and at the Burke County Library, 4th Street, Waynestoro, Geornia 30P30. A copy will also be filed with the Secretary for the Comission's review in accordance with 10 CFR 6 2.206 (c) of the Comission requlations.

Sincerely, Origius stoned Hf M. L Bentse gD 7

O 4

Harold R. Denton, Director PDR Office of Huclear Reactor Regulation G

Enclosuru g/

[9 p(b k

1.

Director's Decision Under 10 CFR S 2.206 ELD U 2.

Related Federal Reg'ister

,_ 'RMount 1

Notice 6/M/81 g

g y.

JL ;L bF i DL ~ 1 DL: '

.Di R

NRR DIR ornce> :ct.....Soo..nnxt. p a 9 0............. IMGi

/.

..... '1

... c.

.. ~.......

... ~....

.~ ~ ~ ~. -..

4 Rush:iog BJY lood RLTedesco I

senhut H

ton sun m a>

.j.g............g.

.g.j.g.g.........

y....~.

...J.............

om)

............. ~.

............... ~...

..... ~ ~.. -

unc rwu m uo an i.acu oua OFFiClAL RECORD COPY usa m m e ow

}

g l

hp

$nr 7

tyg g,

f a

+

-c n

.m p.

m

..~ t

/r Dist.

Docket File bcc:

LB#1 Rdg TERA DEisenhut NRC/4DR BJYoungblood L/PDR JGrant

-NSIC Docket Nos.: 50-424 MRushbrook

/ TIC and 50-425 HDenton

/

ACRS (16)

RTedesco

/

RVollmer /

Hr. Gary Flack, Esq.

TMurley/

1515 Healey Buildin9 RMattson 57 Forsyth Street, N. W.

RHartf'ield, MPA Atlanta, Georgia 30303 WJoh'nston OELD

Dear fir. Flack:

01E (3)

On September 25, 1980, you requested on behalf,0f Georgians Against Nuclear Energy (GANE) that the Director of Huelear Reactor Regulation hold hearings to assess the need for power from the Alvin W. Vogtle Nuclear Plant, Units 1 & 2.

As a basis of its request, GANE cited an electricity demand forecast submitted by GPC to the Georgia Public Service Comission. According to GANE, this forecast indicates that upon completion of the two Vogtle facilities, GPC will have greater excess reserve generating capacity than was orginally anticipated in the initial construction permit proceeding. GANE asserts that this information regarding excess ca'pacity constitutes new information not

(

previously considered by the NRC..-p GANE's position has been treated undet 10 CFR 5 2.206 of the Cocnission's regulations. Upon review of GANE's filings and of other relevant information, I have determined to cany the request.

The reasons for this decision are fully discussed in th( enclosed " Director's Decision under 10 CFR S2.206."

Also enclosed is a copy of a Federal Register Notice regarding this decision that is being filed with the Office of the Federal Register.

A copy of this decision will be placed in the Comission's Public Document Roon at 1717 H Street, N.

W., kashington, D. C.

20555 and at the Burke County Library, 4th Street, Waynesboro, Georgia 30830. A copy will also be filed with the Secretary for the Comission's review in accordance with 10 CFR S 2.206 (c) of the Cor.uission regulations.

Sincerely, Harold R. Denton, Director Office of Nuclear Reactor Regulation Encibsure:

1. / Director's Decision Under

/ 10 CFR 5 2.206 DL:LB#1 DL:AD/L DL:DIR

/

MRushbrook RTedesco[) DEisenhut

7. Related Federal Register 6/ /81 6/ /81b

, 6/ /81

/

tiotice

/

M

\\O, A __ ___

r UL:LUE1 a UL:Lb91 UtLU

'V UL:U1K See nl ext page

,,kQi 0*C'>

CC:

,,j JG[a],,[ys,

BJYgungb,lood HDenton,,,,

=4 6/ /81 6/ /81 6/ /81 6/ /81 em) qc rosu me e sscu mo OFFICIAL RECORD COPY

  • ""-3=

1 Mr. W. E. Ehrensperger Senior Vice President Power Supply Georgia Power Company-P. 0.-Box 4545-

- Atlanta, Georgia 30302 cc: Mr. L. T. Gucwa Chief Nuclear Engineer Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Vice President Southern Services, Inc.

P. 0. Box 2625 Birmingham, Alabamm 35202 Mr. J. A. Baily Project Licensing Manager Southern Company Services, Inc.

P. 0. Box 2625 Birmingham, Alabama 35202 George F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 4

_, _. _. =,.. -,,

_