ML20009B039

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-546/81-09 & 50-547/81-09 on 810501-31.No Noncompliance Noted
ML20009B039
Person / Time
Site: Marble Hill
Issue date: 06/19/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML20009B040 List:
References
NUDOCS 8107140696
Download: ML20009B039 (2)


See also: IR 05000546/1981009

Text

F

o

UNITED STATES

~

8

NUCLEAR REGULATORY COMMISSION

-

n

K

E

REGION lli

799 ROOSEVELT ROAD

j

gg.....o[

OLEN ELLYN, ILLINOIS 6o137

June 19, 1981

Docket No. 50-546

  • kCD

Docket No. 50-547

/

i

3

%

s

(

.)

'9

[&

6

" i

,

  • ,

Public Service of Indiana

,

p

JUL 131981 * '11

ATTN:

Mr. S. W. Shields

Senior Vice President

uaaA m

Nuclear Division

u.s. unm #

-

'#

12

Post Office Box 190

New Washington, IN 46168

9

Gentlemen:

N

TSis refers to the routine safety inspection conducted by Mr. J. J. Harrison

of this office on May 1-31, 1981, of activities at Marble Hill Nuclear

Generating Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with

Messrs. Petro, Ramsett, and others of your staff at the conclusion of

,

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

8107140696 810619

PDR ADOCK 05000546

G

PDR

f0f

Slj

_ _ _ - _ _ .

vs

-

.

',

Public Service of Indiana

-2-

June 19, 1981

information si.ould be withheld from public disclosure. This section further

l

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

'

incorporated as far as possible into a separate part of the affidavit.

If

we do not liear from you in this regard within the specified periods noted

above, a copy cf this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

R. F. Heishman, Acting Director

Division of Resident and Project

Inspection

i

Enclosure:

IE Inspection

Reports No. 50-546/81-09

and No. 50-547/81-09

cc w/ enc 1:

W. M. Petro, Executive Director,

Nuclear Project Management

C. Kammerer, CA

J. H. Sniezek, IE

DMB/ Document Control Desk (RI"S)

Resident Inspector, RIII

LeBoeuf, Lamb, Leiby & MacRae

Dave Martin, Office of

Attorney General

John R. Galloway, Staff Director,

Environment, Energy and Natural

Resources Subcommittee

E. P. Martin, Wabash Valley

l

Power Association

i

i

p hI h'

f Sc{d '

Kno$0-

RIIAI.

RI

RI L

RIII

e

.

arrison/db

weibinz

tle

p

Heis an

}6/17/81

Y

f

1 f,

)

s

/-

, _ _ _ _

.

__--

_ . . - - . _

.

. - , . . _ _ . . - -