Text
F
o
UNITED STATES
~
8
NUCLEAR REGULATORY COMMISSION
-
n
K
E
REGION lli
799 ROOSEVELT ROAD
j
gg.....o[
OLEN ELLYN, ILLINOIS 6o137
June 19, 1981
Docket No. 50-546
- kCD
Docket No. 50-547
/
i
3
%
s
(
.)
'9
[&
6
" i
,
- ,
Public Service of Indiana
,
p
JUL 131981 * '11
ATTN:
Mr. S. W. Shields
Senior Vice President
uaaA m
Nuclear Division
u.s. unm #
-
'#
12
Post Office Box 190
New Washington, IN 46168
9
Gentlemen:
N
TSis refers to the routine safety inspection conducted by Mr. J. J. Harrison
of this office on May 1-31, 1981, of activities at Marble Hill Nuclear
Generating Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with
Messrs. Petro, Ramsett, and others of your staff at the conclusion of
,
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons on the basis which it is claimed that the
8107140696 810619
PDR ADOCK 05000546
G
f0f
Slj
_ _ _ - _ _ .
vs
-
.
',
Public Service of Indiana
-2-
June 19, 1981
information si.ould be withheld from public disclosure. This section further
l
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
'
incorporated as far as possible into a separate part of the affidavit.
If
we do not liear from you in this regard within the specified periods noted
above, a copy cf this letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
R. F. Heishman, Acting Director
Division of Resident and Project
Inspection
i
Enclosure:
IE Inspection
Reports No. 50-546/81-09
and No. 50-547/81-09
cc w/ enc 1:
W. M. Petro, Executive Director,
Nuclear Project Management
C. Kammerer, CA
J. H. Sniezek, IE
DMB/ Document Control Desk (RI"S)
Resident Inspector, RIII
LeBoeuf, Lamb, Leiby & MacRae
Dave Martin, Office of
Attorney General
John R. Galloway, Staff Director,
Environment, Energy and Natural
Resources Subcommittee
E. P. Martin, Wabash Valley
l
Power Association
i
i
p hI h'
f Sc{d '
Kno$0-
RIIAI.
RI
RI L
RIII
e
.
arrison/db
weibinz
tle
p
Heis an
}6/17/81
Y
f
1 f,
)
s
/-
, _ _ _ _
.
__--
_ . . - - . _
.
. - , . . _ _ . . - -