50.55(e) Re ort Docket No. 0-508/509 Washington Public Power Supply System g Q'8 Box 1223 Elma, Washington 98541 (206)482-4428 e
ja G 19BI o
e July 2, 1981 F/n"ob G03-81-2200 N$cmans Nuclear Regulatory Commission, Region V Suite 202, Walnut Creek Plaza 1990 N. California Boulevard Walnut Creek, California 94596 Attention:
Mr. B. H. Faulkenberry g j s' Chief, Reactor Construction Projects Branch NS -
Gentlemen:
f,7 JUL j O I981h
Subject:
PROJECT NOS. 3 AND 5 T u,5,,'O g g ecer h NRC INSPECTION OF WNP-3 AND WNP-5 B'
cv DOCKET NUMBERS 50-508 AND 50-509 INTERIM REPORT-POTENTIAL 10CFR50.55(e) d A,4;>
RT INDICATIONS ON SAFETY INJECTION TANKS Q
f g\\
AND REACTOR PUMP SUPPORTS, CONTRACT 3240-02, 4
COMBUSTION ENGINEERING
Reference:
G03-81-2012, letter, R. S. Leddick to B. H. Faulkenberry, dated May 21, 1981.
Our reference letter stated that we would provide an interim or final report on the subject matter by July 1,1981.
This letter is to advise you that our evaluation has not yet been completed. We now expect to have the results of that evaluation in early September,1981.
We will submit an interim or final report on this subject by September 15, 1981.
Should you have any questions or desire further information, please feel free to contact me directly.
Very truly yours,
. S. LEDDICK Program Director, WNP-3/5 cc:
J. Adams, PP&L D. Smithpeter, BPA Ebasco, New York WNP-3/5 Files, Richland I