Responds to NRC Re Violations Noted in IE Insp Rept 50-155/81-05.Corrective Actions:Master Training Plan Revised to Include Requirements for Special Training & Retesting of Licensed Operators
ML20009A981
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 06/29/1981
From: Withrow G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20009A975 List:
References
NUDOCS 8107140575
Download: ML20009A981 (4)


Text

  • .

e Genera 8 offices: 212 West Michigan Avenue. Jackson, Michtgen 49201 * (5171 788-0550 June 29, 1981 Mr James G Keppler Office of Inspection and Enfercement Region III US Nuclear Regulator / Cc-4 ssion 799 Rcisevelt Road Glen Ellyn, IL 60137 DOCFET 50-155 - LICZHSE DPR BIG RCCK POINT PLANT - RESPONSE TO II INSFECTION REPORT NO 81-05 IE Inspection Report No 50-155/81-05 dated May 27, 1961, identified one apparent item of noncompliance round at the 31g Rock Point Plant.

Our re-sponse to this violation ( Appendix A, dated June 1,1981) is as follows:

Violation:

Facility Technical Specification 6.h.1 states:

"A retraining and replacement training program for the plant staff shall be maintained under the direction of the Plant Superintendent and shall meet or exceed the requirements and reconmendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR, 7 art 55."

10 CFR 55, Appendix A, Section h.e states that a requalification program shall have " Provisions for each licensed operator and senior operator to participate in an accelerated requalification program where perfor=ance evaluation conducted pursuant to paragraphs ha through hd clearly indicate the need "

Contrar/ to the above, the licensee's existing requalification program is deficient in identifying accelerated training for licensed personnel failing to achieve a passing score on an individual section of the annual requalifi-cation exam.

8107140575 810708 PDR ADOCK 05000155 0

PDR 2

tg i

c

2 Mr James G Keppler Big Rock Point Plant June 29, 1981 Fespense to Violation Changes in the licesnsed operator requalification program as outlined in Censu=ers Power Company's letter of August 6, 1980 were not implemented.

Specifically, two individuals who had not attained a mini =um grade of 705 in so=e specific instruction sections and had not been enrolled in an accel-erated training program on those sections within five days of grade determin-ation as required by the submitted program. A review of the cause of this incident has not identified the reason for the lack of infor=ation transmittal to the Training Department-On-site. Information pertaining to co=mitment ir,plementation is provided later in this submittal.

Corrective Action Taken and Results Achieved The two individuals not completing the licensed operator requalification training as required by the co=mitment in our letter dated August 6,1980 were provided with special training sessions immediately upon identification of this violation by the inspector. Subsequent examination of those individuals resulted in acceptable test scores in those affected sections of the requalifi-cation training program.

Corrective Action to Prevent Recurrence The Big Rock Point Plant Manual Volume 18 - Master Training Plan has been revised to include requirements for special training and retesting as outlined in our letter dated August 6, 1980.

Date When Full Compliance Will be Achieved Full compliance has been achieved for the specific incident that resulted in this violation. Special training for the two licensed personnel was completed on May 11, 1981 and a Master Training Plan revision was issued for implementa-tion on May 26, 1981.

Generic Information Pertaining to Implementation of Co=mitments Consumers Power Company currently uses several methods to implement and veriOf implementation of co=mitments. These methods include the following:

General Licensing Information Distribution - Incoming and outgoing correspondence between Consumers Power Company and the NRC is dis-

[

tributed to all department Directors, Plant Managers / Superintendents l

and a cognizant / responsible individual of the Nuclear Operations Department. It is the responsibility of the " responsible" individual to take action to enact co=mitments in their responsibility area.

The Nuclear Licensing Department provides this distribution and for significant Consumers Power Company ec==1tments includes a cover sheet indicoting Licensing's interpretation of those ec=mitments and identifying the " responsible" individual.

I l

+

~

3 Mr James G *eppler K

Big Rock Point Plant June 29, 1981 Big Rock Point Plant Licenning Information Distribution - Incoming and outgoing correspondet.W between Consumers Power Company and the NRC is distributed internsdly upon receipt at the plant.

Distribution to the Plant Re'riev Ccmmittee (PRC) via a PRC review routing for=,

to the Operations Department for Senior Licensed Operator review and to the Training Department-On-site provides notification tc personnel responsible for implementation of ec=mitments.

Plant Quality Assurance Varification - The plant Quality Assurance Department performs random verifications of commitment implementation completion to ascertain the effectiveness of the above methods.

l Consumers Power Company recognizes the necessity and complexity of assuring commitment implementation. Therefore, centinuing efforts are being made to develop new systems and methods to accomplish our goal of assuring that all ecm=itments are fully implemented and adhered to.

Examples of systems under development and/or investigation are a computerized Licensing Ccrrespondence Logging System and computerized procedure control systems.

$W dW Gregory Withrow Senior Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector-Big Rock Point Plant l

l

~

'~

  • =.

l

CONSUbERS POWER COMPANY Big Rock Point Plant IE Inspection Report No 50-155/81-05 Response to NRC letter dated June 1, 1981 Docket No 50-155 License No DPR-6 At the request of the Co:m::ission and pursuant to the Atomic Energy Act of 195h, and the Energy Reorgani::ation Act of 1974, as amended, and the Commission's Rules and Regulations thereunder, Consumers Power Company submits our response to NRC letter dated June 1, 1981 which provides IE Inspection Report No 50-155/81-05 and a Notice of holation dated June 1, 1981.

Consumers Power Company's response is dated June 29, 1981.

CONSUMERS POWER COMPANY r.'

s 1

(-

4.Lr)

<bb%

  • b '

By J W ifeynolds, Executive Vice President Energy Supply Sworn and subscribed to before me this 29th day of June 1981.

i,

[

c.

~

e 'v kr, I o f[, _

(szAL)

Helen I Dempski, Notary Public Jackson County, Michigan My cev:ission expires December ik,1983

)