ML20009A959

From kanterella
Jump to navigation Jump to search
Forwards LER 81-022/03L-0
Date released: 01/23/2020 Download: ML20009A959


LER 81-022/03L-0:on 810607,during Testing,Reactor Core Isolation Cooling Turbine Repeatedly Tripped on Overspeed on Fast Starts.Caused by Upward Drift of Flow Controller FIC-2509 High Limit Setpoint.Setpoint Recalibr
ML20009A966
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/07/1981
From: Schmidt A
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20009A966 (1)
Forwards LER 81-022/03L-0
ML20009A958
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/07/1981
From: Mineck D
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20009A958 (1)