APPENDIX A NOTICE OF~ VIOLATION Public Service Electric & Gas Company Docket Nos. 50-354 Hope Creek Units 1 and 2 50-355 CPPR-120 CPPR-121 As a result of the inspection conducted on December 2-5, 1980, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified:
10 CFR 50, Appendix B, Criterion V, states in part, that: " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings...
and shall be accomplished in accordance with these instructions, procedures or drawings.
Instructions, procedures, or drawings shall include...for determining that important activities have been satisfactorily accomplished."
The Construction Quality Control Manual,Section II, paragraph 3.9.3 states, that: The lead discipline Construction Quality Control Engineers shall be respon -
sible for aroviding the necessary orientation and training in the application and use of eaci new quality control instruction prior to implementation in the field.
This orientation and training shall be conducted in sufficier. detsil and with sufficient frequency to assure that the Construction Quality Control Engineers responsible for performing inspections fully understand the requirements contained in the applicable quality control instruction, inspection records and inspection criteria documents.
Contrary to the abote, during the period of October 10-23,1978, an inspector performed concrete preplace:nent, placement, and post placement inspection for which he was not trained and/or incoctrinated as required by the project procedure.
This is a severity level V ytolation (Supplement II).
Pursuant to the provisions of 10 CFR 2.201, Public Service Electric & Gas Company is hereby re this Notice, quired to submit to this office within twenty-five days of the date of a written statemene or explanation in reply, includin : (1) the corrective steps which have been taken and the results achieved; (g) corrective
'2 steps which will be taken to avoid furt*cr violations; and (3) the date when full compliance will be achieved.
Under the authority of Section 182 of the Atomic Energy Act uf 1954, as amended, this respinse shall be submitted under oath or affirn:ation.