Forwards LERs 81-022/03L-0,81-020/03L-0 & 81-023/03L.W/o LER 81-023/03L-0
Date released: 01/23/2020 Download: ML20009A720


LER 81-022/03L-0:on 810603,during Refueling Outage,While Performing Local Leak Rate Testing,Reactor Bldg to Torus Vacuum Breaker Valve 68-09 Failed to Meet Tech Spec Requirements.Caused by Worn Seating & Packing Matls
ML20009A725
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/02/1981
From: Randall R
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20009A725 (1)
LER 81-020/03L-0:on 810605,during Refueling Outage,Check Valves X-81R & X-71E Failed When Tested.Caused by Improper Seating of Valves During Test Procedure.Valves Replaced & Tested Successfully
ML20009A723
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/29/1981
From: Neild R
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20009A723 (1)
Forwards LERs 81-022/03L-0,81-020/03L-0 & 81-023/03L.W/o LER 81-023/03L-0
ML20009A719
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/02/1981
From: Bartlett J
NIAGARA MOHAWK POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20009A719 (1)