Forwards Proposed Order Re 5% Power Level for Consideration at 810617 Meeting
ML20009A678
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 06/15/1981
From: Bradford P
NRC COMMISSION (OCM)
To: Ahearne J, Gilinsky V, Hendrie J
NRC COMMISSION (OCM)
Shared Package
ML20009A670 List:
References
REF-10CFR9.7 NUDOCS 8107130465
Download: ML20009A678 (4)


Text

_ - _ _ _

.. %Kicy s

/ \\

  1. c UNITE D STATES

!.;f ^,. g,%

!I NUCLEAR REGULATO.:.Y COMMISSION

.E W ASHIN GT ON. D.O. 205!5 k[+,'?,h.

d'

  • ./

June 15, 1911 OFFICE OF THE COMM:5SIONER l

MEMOPANDUM F0P.:

Ch:frman Hendrie Concissioner Gilinsky Cor:sissiLner Ahearne N8.

FROM:

Peter A. Bradford i

If a short order attached to a 5% =pproval fer Sec.:oyah would be of interest, I propose the attached for consideration at cur meeting on June 17.

Attachment:

As stated cc:

L. Bickwit, 0GC D. Rathbun, OPE

~

S. Chilk, SECY /

........ =. -..

~

I i

1 i

l l

hok7f h 5 810617 PT9.7 PDR J

_ =

O SEQUOYAH UNIT NO. 2 LICENSE REVISIONS HYDROGEN CONTROL MEASURES ITEM (17) H (2)(B) PREVIOUSLY ITEM (16) H (2)(B)

(RESULTS PROVIDED TO STAFF)

A SCHEDULE FOR CONFIkMATORY TESTS SHALL BE.PROVIDED BY TVA CONSISTENT WITH THE REQUIREMENT TO MEET THE JANUARY ~31, 1982 DEADLINE, SECTION (17) H (1) 0F THE LICENSE UPGRADE EMERGENCY SUPPORT FACILITIES ITEM (17)R - PREVIOUSLY ITEM (16)R DELETE (1) AND (2)

(3)

TVA SHALL HAVE IN OPERATION THE UPGRADED EMERGENCY SUPPORT FACILITIES BY OCTOBER 1, 1982 CONSISTENT WITH THE GUIDANCE OF NUREG-0696 AND IN ACCORDANCE WITH THE PROVISIONS OF NRC LETTER TO TVA DATED MARCH 19, 1981 CONTROL ROOM DESIGN ITEM (17)D - -

PRIOR TO EXCEEDING 5% POWER NEGATIVE PRESSURE IN ABSCE ITEM C (9) - -

PRIOR TO EXCEEDING 5% POWER w

w -.

m

-uwg-,,e.n.-

-wa---

e,, - -..~ena ww~

,.4s-ra--- - -.,,

SEQUOYAH UNIT 2 STATUS OF CONST9ETION ITEMS JUNE 9TH JUNE 16TH 1

PRIOR TO FUEL LOAD-10

'2 PRIOR TO INITIAL CRITICALITY 31 20 PRIOR TO REACHING FULL POWER 2

1 TOTAL 91 21 i

y y-T-*+yy v.w-9--iw-y.,w it-ww w g-g s-s p-y y

yww g---*m.4

-.,-sy...+

-~m-es u

s*

we9..,

,,w*sge-gwp..a.

g

-,-+Ww-3

.g-,ym--e.g.yw-m+,ae q,,v-gg--e-ww-

t

-l s >* *teg

,{p g'c, UNITED STATES NUCLE AR REGULATORY cot' MISSION v.2s e cro..o.c :osss y.,

I JUN 121951 MEMORANDUM FOR:

Chairman Hendrie Commissioner Gilinsky Commissioner Bradford Commissioner Ahearne THRU:

William J. Dircks W.

~

M' Executive Director for Operations FRC!i:

Harold R. Denton, Director, ONRP.

SUBJECT:

STARTUP SCHEDULE FOR SEQUDYAH, UNIT NO. 2 Enclosed for information is a planned startup schedule for Unit 2 provided 10, 1981. TVA projects a fuel load date of June 18th by TVA on June followed by six weeks of preparation and tests prior to exceeding a 5%

power level.

Experience indicates that such a schedule is very optimistic and contains no allowance for unanticipated events.

As of June 10th, IE states that 3 of the 10 items on the Prior to Fuel Loading list and.4 of the 31 items on the Prior.to Initial Criticality list are com-pl e te. The TVA-estimated fuel load date is still achievable according to IE's Region II staff.

Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated l

cc:

SECY-OGC OPE OCA D

e-

  • G e

e

.i

i i,

/

J f/

Iv,

/

i i

t ;

/

/

/)

/

/

.1

/

/

/

/

l

/

t

/

(/

/

)

l l

l l

I

,