ML20009A678
| ML20009A678 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/15/1981 |
| From: | Bradford P NRC COMMISSION (OCM) |
| To: | Ahearne J, Gilinsky V, Hendrie J NRC COMMISSION (OCM) |
| Shared Package | |
| ML20009A670 | List: |
| References | |
| REF-10CFR9.7 NUDOCS 8107130465 | |
| Download: ML20009A678 (4) | |
Text
_ - _ _ _
.. %Kicy s
/ \\
- c UNITE D STATES
!.;f ^,. g,%
!I NUCLEAR REGULATO.:.Y COMMISSION
.E W ASHIN GT ON. D.O. 205!5 k[+,'?,h.
d'
- ./
June 15, 1911 OFFICE OF THE COMM:5SIONER l
MEMOPANDUM F0P.:
Ch:frman Hendrie Concissioner Gilinsky Cor:sissiLner Ahearne N8.
FROM:
Peter A. Bradford i
If a short order attached to a 5% =pproval fer Sec.:oyah would be of interest, I propose the attached for consideration at cur meeting on June 17.
Attachment:
As stated cc:
L. Bickwit, 0GC D. Rathbun, OPE
~
S. Chilk, SECY /
........ =. -..
~
I i
1 i
l l
hok7f h 5 810617 PT9.7 PDR J
_ =
O SEQUOYAH UNIT NO. 2 LICENSE REVISIONS HYDROGEN CONTROL MEASURES ITEM (17) H (2)(B) PREVIOUSLY ITEM (16) H (2)(B)
(RESULTS PROVIDED TO STAFF)
A SCHEDULE FOR CONFIkMATORY TESTS SHALL BE.PROVIDED BY TVA CONSISTENT WITH THE REQUIREMENT TO MEET THE JANUARY ~31, 1982 DEADLINE, SECTION (17) H (1) 0F THE LICENSE UPGRADE EMERGENCY SUPPORT FACILITIES ITEM (17)R - PREVIOUSLY ITEM (16)R DELETE (1) AND (2)
(3)
TVA SHALL HAVE IN OPERATION THE UPGRADED EMERGENCY SUPPORT FACILITIES BY OCTOBER 1, 1982 CONSISTENT WITH THE GUIDANCE OF NUREG-0696 AND IN ACCORDANCE WITH THE PROVISIONS OF NRC LETTER TO TVA DATED MARCH 19, 1981 CONTROL ROOM DESIGN ITEM (17)D - -
PRIOR TO EXCEEDING 5% POWER NEGATIVE PRESSURE IN ABSCE ITEM C (9) - -
PRIOR TO EXCEEDING 5% POWER w
w -.
m
-uwg-,,e.n.-
-wa---
e,, - -..~ena ww~
,.4s-ra--- - -.,,
SEQUOYAH UNIT 2 STATUS OF CONST9ETION ITEMS JUNE 9TH JUNE 16TH 1
PRIOR TO FUEL LOAD-10
'2 PRIOR TO INITIAL CRITICALITY 31 20 PRIOR TO REACHING FULL POWER 2
1 TOTAL 91 21 i
y y-T-*+yy v.w-9--iw-y.,w it-ww w g-g s-s p-y y
yww g---*m.4
-.,-sy...+
-~m-es u
s*
we9..,
,,w*sge-gwp..a.
g
-,-+Ww-3
.g-,ym--e.g.yw-m+,ae q,,v-gg--e-ww-
t
-l s >* *teg
,{p g'c, UNITED STATES NUCLE AR REGULATORY cot' MISSION v.2s e cro..o.c :osss y.,
I JUN 121951 MEMORANDUM FOR:
Chairman Hendrie Commissioner Gilinsky Commissioner Bradford Commissioner Ahearne THRU:
William J. Dircks W.
- ~
M' Executive Director for Operations FRC!i:
Harold R. Denton, Director, ONRP.
SUBJECT:
STARTUP SCHEDULE FOR SEQUDYAH, UNIT NO. 2 Enclosed for information is a planned startup schedule for Unit 2 provided 10, 1981. TVA projects a fuel load date of June 18th by TVA on June followed by six weeks of preparation and tests prior to exceeding a 5%
power level.
Experience indicates that such a schedule is very optimistic and contains no allowance for unanticipated events.
As of June 10th, IE states that 3 of the 10 items on the Prior to Fuel Loading list and.4 of the 31 items on the Prior.to Initial Criticality list are com-pl e te. The TVA-estimated fuel load date is still achievable according to IE's Region II staff.
Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosure:
As stated l
cc:
SECY-OGC OPE OCA D
e-
- G e
e
.i
i i,
/
J f/
Iv,
/
i i
t ;
/
/
/)
/
/
.1
/
/
/
/
l
/
t
/
(/
/
)
l l
l l
I
,