ML20009A613
| ML20009A613 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 06/26/1981 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20009A614 | List: |
| References | |
| NUDOCS 8107130376 | |
| Download: ML20009A613 (2) | |
See also: IR 05000352/1981008
Text
M uro
,
[p
UNITED STATES
,og
e
g
NUCLEAR REGULATORY COMMISSION
y
lT, '
y
REGION I
O
&
631 PARK AVENUE
s
%.....,o#
KING OF PRUSSIA. PENNSYLVANIA 19406
Docket Nos. 50-352
\\*
4
,g
50-353
JUN 261981
4
g
y
s
C
d' y "* ( YC
Philadelphia Electric Company
2,4
JUL 1019815 -8
ATTN:
Mr. John S. Kemper
D
Vice President
Q w.s. mum uou
""
Engint...ing and Research
4
- 3/
.
2301 Market Street
N
kt;
Q
Philadelphia, PA 19101
Gentlemen:
Subject:
Combined Inspection 50-352/81-08 and 50-353/81-06
This refers to the routine safety inspection conducted by Mr. J. Durr of this
.
office on May 1-29, 1981 at the Limerick Generating Station, Units 1 and 2,
2
Limerick, Pennsylvania of activities authorized by NRC License Nos. CPPR-106
and CPPR-107 and to the discussions of our findings held by Mr. Durr with Mr.
'
J. Corcoran of your staff at the conclusion of the inspection.
Areas examined during this inspection are described .c the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by
the inspector, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of noncom-
pliance has been categorized into the levels described in the Federal Register
Notice (45 FR 66754) dated October 7, 1980.
You are required to respond to
this letter and in preparing your response., you chould follow the instructions
in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
'
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written application
to this office to withhold such information.
Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it is
$b
9t
5i
t
I
8107130376 810626
'
PDk .4 DOCK 05000352
O
_ _ . _ _ .
-
.
_
. _ . -
_ . _ .
. -
_
__
-
-
i
.
-
.
Philadelphia Electric Company
2
JUN 261381
claimed that the information should be withheld from public disclosure.
This
section further requires the statement to address with specificity the consider-
ations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld
shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
above, the report will be placed in the Public Document Room.
The telephone
notification of your intent to request withholding, or any request for an
extension of the 10 day period which you believe necessary, should be made to
the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
,
,
R. R. Keim'g, Chie
Projects ranch #2, Division of
Resident and Project Inspection
Enclosure:
Combined Office of Inspection and Enforcement
Inspection Report Number 50-352/81-08 and 50-353/81-06
cc w/ encl:
V. S. Boyer, Senior Vice President, Nuclear Power
I
l
I
I
i
i
l
I
.--
. - .- - .
.- -
-... -.-.-.
- _ -.. - - . , -
._
-_