ML20009A485
| ML20009A485 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/08/1981 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Oprea G HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20009A486 | List: |
| References | |
| NUDOCS 8107130218 | |
| Download: ML20009A485 (2) | |
See also: IR 05000498/1981020
Text
e
a
.
UNITED STATES
[ga af aw%,
NUCLEAR REGULATORY COMMISSION
fi
%
REGION IV
%,f;t
7 -
'#
611 RY AN PLAZA DRP/~. SulTE 1000
ig
,.[ / , f
ARLINGTON, TEXAS 76012
2\\,A.....f
June 8, 1981
f a
'"
In Reply Refer to:
RIV
Docket Nos. 50-498/Rpt. 81-20
50-499/Rpt. 81-20
'
%
/'Q
f[' di/4 jO /g [
_7
b
Houston Lighting and Power Company
ATTN: Mr. G. W. Oprea, Jr.
&
%.
&
Executive Vice President
gI
Post Office Box 1700
t;
A
A.
%
6
[%
Houston, Texas 77001
5
%jg
h
Gentlemen:
V
This refers to the inspection conducted by our Resident Reactor Inspector,
Mr. H. S. Phillips, during May 1981, of activities authorized by NRC
Construction Pennits No. CPPR-128 and 129 for the South Texas Project,
Units No.1 and 2, and to the discussions of our findings with Mr. R. A.
Frazar and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, - " cbservation by the inspector.
Within the sco
tne inspection, no violations or deviations were identified.
,
r
We have also examined actions you have taken with regard to previously identified
inspection findings.
The status of these items is identified in paragraphs 2
and 3 of the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within 10 days from the date of
this letter of your intention to file a request for withholding; and (b) sub-
mit within 25 days from the date of this letter a written application to this
office to withhold such information.
If your receipt of this letter has been
delayed such that less than seven days are available for your review, please
notify this office promptly so that a new due date may be established.
f
'
8107130218 810608
l
PDR ADOCK 05000498
G
-
-
.
.
Houston Lighting and Power Company
2
June 8, 1981
Consistent with Section 2.720(b)(1), any such application must be accompanied
by an affidavit executed by the owner of the information which identifies the
document or part sought to be withheld, and which contains a full statement
of the reasons on the basis which it is claimed that the information should be
withheld from public disclosure. This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
,
i
The information sought to be withheld shall be incorporated as far as possible
i,
into a separate part of the affidavit.
If we do not hear from you in this
1
regard within the specified periods noted above, the report will be placed in
j
the Public Document Room.
I
Should you have any questions concerning this inspection, we wili be pleased
,
to discuss them with you.
I
t
Sincerely,
GW
l
G. L. Madsen, Chief
i
Reactor Projects Branch
l
Enclosure:
IE Inspection Report No. 50-498/81-20