ML20009A485

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-498/81-20 & 50-499/81-20 on 810501-31.No Noncompliance Noted
ML20009A485
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/08/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20009A486 List:
References
NUDOCS 8107130218
Download: ML20009A485 (2)


See also: IR 05000498/1981020

Text

e

a

.

UNITED STATES

[ga af aw%,

NUCLEAR REGULATORY COMMISSION

fi

%

REGION IV

%,f;t

7 -

'#

611 RY AN PLAZA DRP/~. SulTE 1000

ig

,.[ / , f

ARLINGTON, TEXAS 76012

2\\,A.....f

June 8, 1981

f a

'"

In Reply Refer to:

RIV

Docket Nos. 50-498/Rpt. 81-20

50-499/Rpt. 81-20

'

%

/'Q

f[' di/4 jO /g [

_7

b

Houston Lighting and Power Company

ATTN: Mr. G. W. Oprea, Jr.

&

%.

&

Executive Vice President

gI

Post Office Box 1700

t;

A

A.

%

6

[%

Houston, Texas 77001

5

%jg

h

Gentlemen:

V

This refers to the inspection conducted by our Resident Reactor Inspector,

Mr. H. S. Phillips, during May 1981, of activities authorized by NRC

Construction Pennits No. CPPR-128 and 129 for the South Texas Project,

Units No.1 and 2, and to the discussions of our findings with Mr. R. A.

Frazar and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, - " cbservation by the inspector.

Within the sco

tne inspection, no violations or deviations were identified.

,

r

We have also examined actions you have taken with regard to previously identified

inspection findings.

The status of these items is identified in paragraphs 2

and 3 of the enclosed report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within 10 days from the date of

this letter of your intention to file a request for withholding; and (b) sub-

mit within 25 days from the date of this letter a written application to this

office to withhold such information.

If your receipt of this letter has been

delayed such that less than seven days are available for your review, please

notify this office promptly so that a new due date may be established.

f

'

8107130218 810608

l

PDR ADOCK 05000498

G

PDR

-

-

.

.

Houston Lighting and Power Company

2

June 8, 1981

Consistent with Section 2.720(b)(1), any such application must be accompanied

by an affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement

of the reasons on the basis which it is claimed that the information should be

withheld from public disclosure. This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

,

i

The information sought to be withheld shall be incorporated as far as possible

i,

into a separate part of the affidavit.

If we do not hear from you in this

1

regard within the specified periods noted above, the report will be placed in

j

the Public Document Room.

I

Should you have any questions concerning this inspection, we wili be pleased

,

to discuss them with you.

I

t

Sincerely,

GW

l

G. L. Madsen, Chief

i

Reactor Projects Branch

l

Enclosure:

IE Inspection Report No. 50-498/81-20

50-499/81-20

.

!

I

!

l

\\

l

l

i

1

.

-

.

- .

. - - -

- -