Responds to NRC 810212 Ltr Re Violations Noted in IE Insp Rept 50-293/80-30.Corrective Actions:Drywell Venting Procedure Revised & Overtime Policy for Licensed Operators Established
ML20009A444
Person / Time
Site: Pilgrim
Issue date: 06/03/1981
From: Morisi A
BOSTON EDISON CO.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20009A443 List:
References
81-122, NUDOCS 8107130107
Download: ML20009A444 (2)


Text

.

BODTON EDIEON COMPANY

  1. GENERAL offices 800 BovLeicN STREET BO sTO N. M As s ACMus ETTs 0 219 9 A. V. M O RISI MANAGER Nd CLEAR QPERATIONS SU PPORT DEPARTM ENT June 3, 1981 BECo. Ltr. #81-122 Mr. Eldon J. Brunner, Chief Projects Branch #1 Division of Resident and Project Inspection U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA. 19406 License No. DPR-35 Docket No. 50-293

Dear Sir:

The following is in response to your letter of February 12, 1980, IE Inspection Report Number 80-30:

Finding The licensee committed in correspondence of August 21, 1979, and Decenter 19, 1979, to limit the operation of the conta;nment purge and vent valves (other than those used for drywell-torus d/p control) to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per year during power operation.

Contrary to the above, on November 21, 1980, the licensee had not implemented controls to limit the operation of the containment purge and vent valves to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per year during power operation. The licensee detennined that, since plant startup following the January - May 1980 refueling outage, that the 20 inch purge valves had been opened for approximately 145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br /> during power opera-tion (greater than one percent power).

Response

Oper 30, entitled "Drywell Venting Data Sheet" an attachment to station procedure number 2.2.70, entitled " Primary Containment Atmospheric Control System" was revised to require management notification after 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> of "open time on" these valves. To supplement these procedural controls and ensure that operating person-nel were alerted to changes in the status of the 20 inch purge valves, Oper 38, entitled " Shift Turnover Sheet", an attachment to station procedure 1.3.18, Revision 8, entitled " Relief of Personnel", is also being revised. Per shift and year to date closure times on the eight vent and purge valves will be recorded each shift. The acceptance criteria will specify that station management be notified when a predetermined "amt. of open time" exceeded. The supplemental procedure change will be completed by July 1,1981.

8107130107 810702 PDR ADOCK 05000293 G PDR

(

- Q Bbs" TON EOlsON COMPANY

]

Mr. Eldon J. Brunner, Chief

June 3,1981 Page 2 Findi ng The licensee committed in correspondence of October 15, 19 80 to limit a member of the required shift staff from working more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> straight while performing safety related control room duties.

Contrary to the above, between Novenber 21 and 24,1980, a control room operator had been on watch for 32 straight hours.

Response

Boston Edison has established an overtime policy for licensed operators. This policy is not applicable to non-licensed personnel . To implement this policy, station procedure 1.3.17, entitled " Manning of Control Room", has been revised to include the following:

"Every effort shall be made to obtain a qualified relief to ensure that a licensed operator does not exceed twelve (12) hours in the control room performing nuclear safety related functions. Approval from the Nuclear Operations Manager or his Deputy shall be obtained to exceed this twelve (12) hours, however, under no circumstance shall the licensed operator exceed 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> performing nuclear safety related control room functions."

To assist in adherence to this policy, the Deputy Nuclear Operations Manager has instructed operating personnel to record in the Watch Engineer Log Book the specific duty assignments of each individual on the operating shift. Thi s practice is currently in use and will be incorporated into station procedure 1.3.18 by July 1,1981.

4 We believe these resoonses to be satisfactory. If you have further questions regarding these items please contact us.

Very truly yours ,

r i

f,'

l , .. . c j

Ndb / /

-,--:,. -+ . , . , - . . - . - - . - - - - - - . . . - - - - - - , . . . . . - - . . - - . - - - - - . - - - - . . - - - - - - - - ~