Text
r
,,
'
J
UNITED STATES
! are
w
o,
NUCLEAR REGULATORY COMMISSION
Oi
%
REGION IV
~3
'[ '
0
611 RY AN PLAZA DRIVE.SulTE 1000
nag -
, - E
ARLINGTON. TEXAS 76012
%
June 16, 1981
. . . . . .
,
In Reply Refer To:
RIV
WN
"
Docket STN 50-482/Rpt. 81-11
O'f'
9
%
s
S_T hD
$BI -
O B
Kansas Gas and Electric Company
jj
N
~~.(3
ATTN: Mr. Glenn L. Koester
.c
9
o .5
'b
Vice President - Nuclear
Post Office Box 208
e),
3
Wichita, Kansas 67201
a
s&p'
..
Gentlemen:
This refers to the inspection conducted by Mr. L. D. Gilbert of our staff
during the period June 1-5, 1981, of activities authorized by NRC Construction
Permit CPPR-147 for Wolf Creek, Unit 1, and to the discussion of our findings
with Mr. D. W. Prigel and other members of your staff at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of the inspection, no violations or deviations were identi-
fied.
Two new unresolved items are identified in paragraphs 4 and 5 of the enclosed
report.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspectior report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
believe to be exempt from disclosure under 10 CrR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within 10 days from the date of
this letter of your intention to file a request for withholding; and (b) sub-
mit within 25 days from the date of this letter a wr% ten application to this
office to withhold such information.
If your receipt of this letter has been
delayed such that less than seven days are available for yot
review, please
notify this office promptly so that a new due date may be established. 'EGol
J
/
8107090251 810616
PDR ADOCK 05000482
G
-
.
Kansas Gas and Electric Company
-2-
June 16, 1981
.
Consistent with Section 2.790(b)(1), any such application must be accompanied
by an affidavit executed by the owner of the information which identifies the
document or part sought to be withheld, and which contains a full statement of
the reasons on the basis which it is claimed that the information should be
withheld from public disclosure.
This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, the report will be placed in
the public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
/
Mlb
W. C. Seidle, Chief
Engineering Inspection Branch
Enclosure:
IE Inspection Report STN 50-482/81-11