UNITED STATES
8
3
NUCLEAR REGULATORY COMMISSION
3
E
REGION ll
I
101 MARIETTA ST., N.W., SUITE : 100
j[
ATLANTA, GEORGIA 30303
G
<-
APR 7
1981
$
""*
-
Alabama Power Company
@
['
$
f
W
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
k
MAY l 11981 * I2!
P. O. Box 2641
% u.s. mmu uwmu C
Birmingham, AL 35291
cA
F
- 55 *"
/
Gentlemen:
' c ,, , W
g
7
N
Subject: Report No{50-364/81-09,)
This refers to the routine safety inspection conducted by G. L. Troup of this
office on March 17-19, 1981, of activities authorized by NRC License No. NPF-8
for the Farley Unit 2 facility and to the discussion of our findings held with
W. G. Hairston, III at the conclusion of the inspection.
Areas examined durir.g the inspection and our findi.1gs are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC's Public Document Room.
If this report
contains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 days to this office
to withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application 1: contained in a separate part of the
document.
If we do not hear from you within the specified period, the report
will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sinc rel ,
-
l
.C
ctin Dir tor
,
,
'
Division o' Resident and
Reactor Project Inspection
Enclosure: (See Page 2)
l
l
81051206M
g
_
-
.
APR 7
1981
-
-
-
,
Alabama Power Company
2
.
Enclosure: Inspection Report No.
50-364/81-09
cc w/ encl:
W. O. Whitt, Executive Vice President
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr., Senior Vice President
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
W. G. Hairston, III, Plant Manager
R. E. Hollands, Jr., QA Supervisor
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
l