ML20008G019

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-364/81-09 on 810317-19.No Noncompliance Noted
ML20008G019
Person / Time
Site: Farley 
Issue date: 04/07/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20008G020 List:
References
NUDOCS 8105120563
Download: ML20008G019 (2)


See also: IR 05000364/1981009

Text

1

f0

n 7e

t

4

UNITED STATES

8

3

NUCLEAR REGULATORY COMMISSION

3

E

REGION ll

I

101 MARIETTA ST., N.W., SUITE : 100

j[

ATLANTA, GEORGIA 30303

G

<-

APR 7

1981

$

""*

-

Alabama Power Company

@

['

$

f

W

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

k

MAY l 11981 * I2!

P. O. Box 2641

% u.s. mmu uwmu C

Birmingham, AL 35291

cA

F

    • 55 *"

/

Gentlemen:

' c ,, , W

g

7

N

Subject: Report No{50-364/81-09,)

This refers to the routine safety inspection conducted by G. L. Troup of this

office on March 17-19, 1981, of activities authorized by NRC License No. NPF-8

for the Farley Unit 2 facility and to the discussion of our findings held with

W. G. Hairston, III at the conclusion of the inspection.

Areas examined durir.g the inspection and our findi.1gs are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application 1: contained in a separate part of the

document.

If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sinc rel ,

-

l

.C

ctin Dir tor

,

,

'

Division o' Resident and

Reactor Project Inspection

Enclosure: (See Page 2)

l

l

81051206M

g

_

-

.

APR 7

1981

-

-

-

,

Alabama Power Company

2

.

Enclosure: Inspection Report No.

50-364/81-09

cc w/ encl:

W. O. Whitt, Executive Vice President

H. O. Thrash, Manager, Nuclear Generation

F. L. Clayton, Jr., Senior Vice President

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

W. G. Hairston, III, Plant Manager

R. E. Hollands, Jr., QA Supervisor

0. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

l

l

_

m

1

l

l

l