MONTHYEARML19248C2221980-10-29029 October 1980 Provides Insights on Overcooling Transients in Plants W/B&W Nsss.Frequency of Overcooling Transients Diminishes Prior to Commercial Operations.Summary of Overcooling Events Encl Project stage: Other ML19247E4321981-03-0303 March 1981 Provides fracture-mechanics Parametric Analysis of Overcooling Accident at Facility,In Response to Request Project stage: Other ML19247E4331981-04-10010 April 1981 Updates Re Safety Implications of Control Sys & Dynamic Characteristics of Nuclear Facilities.Pressurized Thermal Shock Phenomena & Control Sys Implications to Safety Have Not Been Analyzed Project stage: Other ML20042C1171981-04-11011 April 1981 Plant Shutdown & Cooldown, Revision 19 Project stage: Other ML19247E4301981-04-21021 April 1981 Forwards Preliminary Assessment of Frequency of Excessive Cooldown Events Challenging Vessel Integrity,In Response to 810417 Request Project stage: Other ML19247E4311981-04-21021 April 1981 Forwards Modified Table 1 to 810421 Memo.Further Consideration of B&W Two Bus Design W/Failure of Single Bus Has Led to Revision of HEP Project stage: Other ML19247E4271981-04-28028 April 1981 Forwards Preliminary Assessment of Thermal Shock to PWR Reactor Pressure Vessels,In Response to 810416 Memo Project stage: Other ML19350D6861981-04-30030 April 1981 EPRI Research on Properties of Irradiated Matl Pertinent to Overcooling Transients Project stage: Other ML20008F8811981-05-0505 May 1981 Informs That Data Presented in BAW-1511 P, Radiation- Induced Reduction & Charpy Upper-Shelf Energy of Reactor Vessel Welds, Is Applicable to Facility.Completion of Work in Other Phases of Program Will Justify Plant Operation Project stage: Other ML19350D6831981-05-12012 May 1981 Forwards Ltr Rept in Response to NRC 810429 Request for Addl Info Re Thermal Shock Issue.Also Forwards Summary of EPRI Programs Project stage: Request ML20004A4921981-05-12012 May 1981 Discusses Results of Preliminary Review of Thermal Shock to PWR Pressure Vessels.Reasonable Assurance Found That Plant Can Continue to Operate During Generic Evaluation Project stage: Approval ML19350D6851981-05-15015 May 1981 Ltr Rept on Reactor Vessel Brittle Fracture Concerns in B&W Operating Plants Project stage: Other ML20004B0751981-05-22022 May 1981 Notifies That Info Provided in Re Reactor Vessel Brittle Fracture Concerns in B&W Plants Is Applicable to Facility.Util Will Perform Further Fracture Analyses & Participate in Owners Group Activities Re Thermal Shock Project stage: Other ML20030A7701981-07-20020 July 1981 Notification of 810728,29 & 30 Meetings W/B&W,Westinghouse & C-E Owners Groups in Bethesda,Md to Discuss Thermal Shock to Reactor Pressure Vessel Issue Project stage: Meeting ML20030D6551981-08-21021 August 1981 Requests Addl Info Re Pressurized Thermal Shock to Reactor Pressure Vessels,Per Review of PWR Owners Group 810515 & Licensees 810522 Responses to NRC Project stage: Approval ML20033A3541981-10-30030 October 1981 Forwards NRC Evaluation of ORNL Rept on Pressurized Thermal Shock.Rept Does Not Change Previous NRC Conclusion That Probability of Occurrence of Severe Pressurized Overcooling Transients Too Low to Require Immediate Action Project stage: Other ML20042C1201982-03-0808 March 1982 Loss of Steam Generator Feed, Revision 16 Project stage: Other ML20042C1181982-03-0808 March 1982 Loss of Reactor Coolant/Rcs Pressure, Revision 17 Project stage: Other ML20042C1151982-03-17017 March 1982 Responds to NRC & Submits Addl Info Re NUREG-0737 Item II.K.2.13, Thermal Mechanical Rept. Procedures Re Plant Shutdown & Cooldown,Loss of Reactor Coolant/Reactor Coolant Pressure & Loss of Steam Generator Feed Encl Project stage: Other ML20054H6621982-06-21021 June 1982 Comments on Proposed Regulatory Position Re Pressurized Thermal Shock,As Discussed at 820609 Meeting W/Nrc.Programs Undertaken to Prevent Overcooling,Following 780320 Event, Also Discussed Project stage: Meeting 1981-05-12
[Table View] |
Text
... _ _ _. -
$ SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6 SMUD 95813; (916) 452 3211 May 5, 1981 t-ldW)R O
MAY'1119814e
- DIRECTOR OF NUCLEAR REACTOR REG' LATION
~~.A U 8== =c**ma 4 J
ATTENTION: JOHN F STOLZ CHIEF G
3 OPERATING REACTORS BRANCH 4
/,\\
Q U S NUCLEAR REGULATORY COMMISSION 4/
- s/
N W/;SHINGTON DC 20555 DOCKET 50-312 RANCHO SECO NUCLEAR GENERATING STATION UNIT N0 1 On Ma-ch 12, 1981, the Babcock & Wilcox Company submitted B&W's Generic Report BAW-1511 P, "A Radiation-Induced Reduction and Charpy Upper-Shelf Energy of Reactor Vessel Welds", to the NRC by, letter from
, James H. Taylor to A nn S. Berggren. This report was submitted by B&W on behalf of the Reactor Vessel Materials Subcommittee of the B&W Owners' Group. The Sacramento Municipal Utility District is a member of this subcommittee.
We have leviewed this report and find the data presented therein appli-cable to Rancho Seco, Unit No. 1.
This report shows that the Rancho Seco, Unit No.1 Reactor Vessel welds are predicted to exhibit a Charpy Upper-Shelf Energy c.' more than 50 f t-lb for more than 16 years. Completion of work in other phases of the B&W Owners' Group Program will provide justi-fication for plant operation for the 40-year design life of the vessel.
b John J Mattimoe Assistant General Manager and Chief Engineer
/
8105120 M
[
AN ELECTRIC SYSTE M S E RVIN G MORE THAN 600.000 IN THE HEART OF C A LIF 0 R N I A
.