Table 14.1-2a to Revised Startup Test Program
ML20008F872
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/13/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20008F871 List:
References
NUDOCS 8105120222
Download: ML20008F872 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _

CD W

C Ut -

TABLE 14.1-2a(continued) to LIST OF STARTUP TESTS - Unit 2

'N N

Test Objectives Summary of Testing and

.p Title of Test Test Prerequisites Acceptance Criteria III.

Initial Criticality and Low Power Testing (cont'd.)

The test determines the differential

  • SU-7.4 Rod and Boron Reactor just critical at zero and integral worth of the highest Worth Measure-power.

Rod banks positioned as ments During specified in startup se'quence w rth RCC bank and determines the dif f-,

Baron Dilution (SU-7.1).

RCC control on bank crential boron, worth over the range of the hi.aest worth RCC bank.

t control. Reactor coolant system

  • SU-7.5 Rod ur.1 Boroa pressure at 2235 A 50 psig; cool-Worth Measure-ant system temperature at 547 + 5, The nuclear design predictions for the w*

ments During Flux signal from one highest Rod Cluster Control Assembly (RCC j

.y Boron Addition power range detector connected t group worth is validated. Rods are in-g reactivity computer, serted or withdrawn as boron is constant 1 E

added or diluted. The worth of the rods is compensated for by; boron. Rod move-ment will cause step changes in reacti-vity which are measured on a reactivity g

computer.

g Q

t-ritferential boron worth measurements y

are made by increasing or decreasing reactor coolant boron concentration, Q

Compensation for reactivity effect of y

boron concentration clanr.e will be made by withdrawing or Inserting, the highest worth RCCA group. ~

}*[* -

  • Test Objectives, S caary of Testing, and Acceptance ('d teria ' applies for both

.y.

SU-7.4 and L.-7.5.

1-l i

.. _ -_ _ _ - - - -. _ ~..

~ - - _ _.. _

+.

V

' TABLE 14.1-2a(continued)

LIST OF STARTUP TESTS - Unit 2 Test Objectives Su= mary-of Testing and Title of Test Test Prerequisites Acceptance Criteria III.

Initial Criticality and Low Power Testing (cont'd.)

  • SU-7.4 Rod and Boron Worth Measure-The total worth of the highest f'

..' k

..~'*

ments During vorth RCCA group is obtained Boron Dilution by sumrning the accumblated change in core reactivity correspond- '

  • SU-7.5 Rod and Boron ing to these successive rod Worth Measure-movements..

[

'Z ments During j.

(

Boron Addition 1

(cont'd.)

(

!?

M e

.f 1,

I $

e

]

(

t t

a,

, ' *5

  • Test Objectives, Summary of Testing, and

' Acceptance Criteria applies for both' SU-7.4 and SU-7.5.

..