ML20008F631

From kanterella
Jump to navigation Jump to search
Forwards LER 81-019/03L-0.Detailed Event Analysis Encl
Date released: 01/22/2020 Download: ML20008F631


LER 81-019/03L-0:on 810220,plant Operated in Degraded Mode to Repair Pressure Control Valve PV-21243-1.Caused by Excessive Leakage Through 1/2-inch Masoneilan Pressure Control Valve.Valve Stroke Lengthened.Seat & Stem Replaced
ML20008F634
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/19/1981
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20008F634 (1)
Forwards LER 81-019/03L-0.Detailed Event Analysis Encl
ML20008F630
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/19/1981
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20008F630 (6)