Interim Deficiency Rept Re Nonconforming Welds in Main Control Panel,Updating 801112 Rept.Generic Program Has Been Developed to Assess Impact Upon Structural Integrity.Insp & Measurements Will Be Completed by 810701
ML20008F559
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/27/1981
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, KMNRC-81-062, KMNRC-81-62, NUDOCS 8104210230
Download: ML20008F559 (2)


Text

W KANSAS GAS AND ELECTRIC COMPANY M ELECTchC CCM*aNY GLENN L EQf4TER vecs pass esgr. =wcLaam February 27, 1981 Mr. W.C. Seidle, Chief Reactor Construction and

/ 52

)s Engineering Support Branch 6

U.S. Nuclear Regulatory Ccmmission 7

Region IV S

611 Ryan Plaza Drive

(

\\I.

Suite 1000

\\hg i

Arlington, Texas 76011

/-;

i

\\q V

l '

KMLNRC 81-062

/)

Re: Docket No. STN 50-482 Cri gD#

Ref: Letter of 11/12/80 from GLKoester, KG&E, to W.C. Seidle, NRC Subj: Interim 10CFR 50.55(e) Report - Nonconforming Welds in Main Control Panels

Dear Mr. Seidle:

The purpose of this letter is to update the Referenced Report concerning weld discrepancies in the Main Control Panels and Auxiliary Relay Racks furnished to Wolf Creek site by Comsip Customline Corporation. It is our understanding that the NRC, Region III was advised by Union Electric of similar weld dis-crepancies in the Control Panels and relay racks also furnished by Comsip to Callaway Site.

Since the weld difficulties were first identified last summer, a generic program has been developed on behalf of both Wolf Creek and Callaway Sites to assess the impact of the weld discrepancies upon the structural integrity of the Comsip furnished panels and racks.

This program consists of seismic testing of a specially constructed prototype panel for purposes of determining the atress capabilities and limits of welds similar to those in the Wolf Creek and Callaway panels, this testing effort has been recently completed anG. the results are being utilized to develop criteria against which the as-welded panels can be measured and evaluated. A series of planned inspections and measurements are presently being initiated at both jobsites and will be used to assess the impact of reported weld discrepancies and further to provide a basis for disposition 810 4 210,2M 3

201 N Market - Wicnita. Karssas - Mail Acaress: PO. Box 208 i Woctvta. Kansas $7201 - Teleonone: Area Ccce Q16) 261-6451

Mr. W.C. Seidle KMLNRC 81-062 February 27, 1981 by the panel designer and by the Architect / Engineer. We presently anticipate this effort being completed on or about July 1,1981.

A report summarizing the result of these inspections and evaluations will be forwarded to the NRC shortly thereafter.

J In the interim, please direct any questions on this mattar to me or to Mr. Gene Rathbun of my staff.

i Sincerely,

$h 1

GLK:bb cc: TVandel (NRC Site Inspector) 4 l