ML20008F318

From kanterella
Jump to navigation Jump to search
Submits Comments & Resolutions Re Review of 800725 Submittal of 800616 Radiation Protection Plan,Revision 2.Radiation Protection Plan Acceptable W/Incorporation of Resolutions. Evaluation Encl
ML20008F318
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/05/1981
From: Barrett L
Office of Nuclear Reactor Regulation
To: Hovey G
METROPOLITAN EDISON CO.
Shared Package
ML20008F319 List:
References
CON-NRC-TMI-81-018, CON-NRC-TMI-81-18, RTR-NUREG-75-087, RTR-NUREG-75-87 NUDOCS 8103120821
Download: ML20008F318 (2)


Text

__

psS ** %

4*

,0, UNtf ED STATES

~^

[ g 5-. (

q NUCLEAR REGULATORY CO M.*.ilssiC N f

W ASH 8NG TON, D.

C.

20555

", } -

',p 0 -

March 5, 1981 NRC/TMI-81-018

  • U : '

,\\

Cocket No.30-320 3

klJLj \\ b,^ "-

Q Metropolitan Edison Company 2-M/n11 g,%,

Mr. Gale Hovey, Vice President

]y,,, %,,

and Director of TMI-2 u

mu o.

P.O. Box 480 3

Middletown, PA 17057 4,.,

.(

<:. 7 ' =

-y N

' \\.-

Dear Mr. Hovey:

s

Subject:

TMI Unit 2 Radiation Protection Plan We have reviewed your Radiation Protection Plan, Revision 2, dated June 16,1980, and submitted to us by letter TLL-356 dated July 25, 1980.

We conclude that minor clarification is required prior to our approval.

Our cc: rents have been discussed and resolved with your staff.

These cc:ments and their resolutions are presented below.

Articles 2, 4, 5, 6, 7, and 9 of the plan are acceptable as submitted.

Article 1 Ccment:

Regulatory Guides 8.2, 8.4 and 8.9 should be referenced.

Resolution:

Your staff has agreed to make reference to these regulatory guides as adc'itional regulatory guidance.

Article 3 Cement: The proposed review and audit procedures should incorporate criteria for timely and appropriate action.

Resolution:

Your staff has agreed to include criteria for timely and appropriate action in implementing procedures for those functions specified in the plan.

Article 8 Com ent:

A means for' strengthening assurance that removable contamination limits are not being exceeded should be instituted.

Assurance snould be given to ensure contaminated material is not released frca the site above the stated limits.

8103120DI g

2 March 5, 1931 Mr. C.11e, Hovey l

l Resolution:

Your staff has agreed to provide for periodic swipe surveys in implementing procedurer.

Our evaluation, based on incorporation of our con:r.ents as agreed to by your staff, is enclosed. With the incorporation of the above resolutions, we conclude that your Radiation Protection Plan is acceptable.

tzt G"

Lake H. Barrett Acting Deputy Program Director TMI Program Office

Enclosure:

As Stated cc:

See Service Distribution List I

9 e

e G

b I

e v,

.,....-.e-,

e-

-n-,.-

-,.aw

.mw

, ~., - - -

,.-9

-4.>,.

-s

..v

-1,-

.,;--s,

,..n.e e.-

,g