ML20008F001

From kanterella
Jump to navigation Jump to search
Forwards Latest Draft Stipulation.Stipulation Complete W/Exception That Contention 8(a) Should Be Included in Attachment a as Stipulated Contention.W/O Encl
ML20008F001
Person / Time
Site: 07002909
Issue date: 02/13/1981
From: Sherwin Turk
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Cowan B, Mcphillips J
ECKERT, SEAMANS, CHERIN & MELLOTT, MCPHILLIPS, J.L.
References
NUDOCS 8103100766
Download: ML20008F001 (1)


Text

g y

L Docket No. 70-2909 February 13, 1981 Julian L. McPhillips, Jr., Esq.

Barton Z. Cowan, Esq.

P. O. Box 64 Eckert, Seamans, Cherin & Mellot 516 South Perry Street 42nd Floor Montgomery, AL 36101 600 Grant Street Pittsburgh, PA 15219 In the Matter of Application of Westinghouse Electric Corporation for a Special Nuclear Material License for the Alabama Nuclear Fuel Fabrication Plant (AriFFP) to be Located Near Prattville, Alabama

Dear Mr. McPhillips,

and fir. Cowan:

I am enclosing the latest draft stipulation, which is complete except that contention 8-(a), with which I previously disagreed, should now be included in Attachment A as a stipulated contention.

Please note the NRC Staff has not yet finally reviewed and approved the stipulation, and that I must reserve the right to modify the stipulation should that prove necessary.

Sincerely, Sherwin E. Turk Counsel for tiRC Staff

Enclosure:

As stated e

SP 4

e g-

. $. b4 l-C FEB 181981* r Q

u,.aw uns sammum C

8103100 7gg 4

c.,,c q.......OE L QD...

cu m ur) SETurk:as A

eby

- carr);. 02[1h. 8ib'2.. 753/.81 L s:c ro n..

mpy eum mo mew.