ML20008E952

From kanterella
Jump to navigation Jump to search
Forwards LER 81-023/03L-0
Date released: 01/22/2020 Download: ML20008E952


LER 81-023/03L-0:on 810126,control Rod Scram Accumulators 46-15 & 30-07 Found Inoperable Due to Inoperable Internal Leakage Detectors.Caused by Sticking Level Switch Floats. Switches Replaced & Detectors Checked
ML20008E953
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/19/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20008E953 (1)
Forwards LER 81-023/03L-0
ML20008E951
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/19/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20008E951 (1)