ML20008E864

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-327/80-47 on 801104-30.No Noncompliance Noted
ML20008E864
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/29/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20008E865 List:
References
NUDOCS 8103100111
Download: ML20008E864 (2)


See also: IR 05000327/1980047

Text

/ /k

v

4@ CE:oq

,

4

UNITED STATES

- [' )^g['k

NUCLEAR REGULATORY COMMISSION

..

.r

REGION 11

k('*d

101 MARIETTA sT., N.W., SUITE 3100

g v ,/

ATLANTA, GEORGIA 30303

JAN 2 91981

cn

D

In Reply Refer To:

RII:SDB

8f

4

/

dE3U7i032'>

'

?)]R

-

-10.,p%o,,$,O 8 g8/g

'12

+

/

~1

Tennessee Valley Authority

g

ATTN:

H. G. Parris

ss

rg

Manager of Power

e

/

500A Chestnut Street Tower II

d

Chattanooga, TN 37401

7

"

Gentlemen:

This refers to the inspection conducted by S. D. Butler of this office on

November 4- 30, 1980, of activities authorized by NRC Operating License No.

DPR-77 for the Sequoyah Nuclear Plant facility, and to the discussion of our

findings held with J. M. Ballentine at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncampliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is co:itained in a

separate part of the document. If we do eat hear from you in this regard within

the specified period, the report will be plsted in the Public Document Room.

Should you have any questions conce W cg this letter, we will be glad to discuss

them with you.

Sincerely,

,

f.C.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

(See Page 2)

810310 0 W

'

9.

I

.

t

.-

Tennessee Valley Authority

-2-

JAN: 9 1931

Enclosure:

Inspection Report No.

50-3*'/80-47

cc w/ encl:

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Scfety

Review Staff

H. J. Green, Division Director

l

l

!

l

I

-

L