{{#Wiki_filter:r , e , / /L /pa reg'o UNITED STATES ~ 8" NUCLEAR REGULATORY COMMISSION n 4 E REGION 111 . k [ 799 ROOSEVELT ROAD M e GLEN ELLYN, ILLINOIS 6o137 g ,o lM 2 6 mi . 6 \\ ,' =d \\;, ' ' G 4< l g- [[[ l[ h - V Docket No. 50-454 Docket No. 50-455 v!n I u,,,o]Rg OIS8fh. Q -- Commonwealth Edison Company k^gg ATTN: Mr. Cordell Reed Vice President ' Post Office Box 767 d Chicago, IL 60690 y Gentlemen: This refers to the routine safety inspection conducted by Mr. C. E. Jones of this office on December 9-12, 1980, of activities at Byron Nuclear Generating Station, Units 1 and 2, authorized by NRC Construction Permits No. CCPR-130 and No. CPPR-131 and to the discussion of our findings with Mr. G. Sorensen at the conclusion of the inspection. The enclosed copy of our inspectica report identifie: areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. During this inspection, certain of your activities appeared to be in non- compliance with NRC requirements, as described in the enclosed Appendix A, and a written response is required. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC's Public Document Room, except as follows. If the enclosures contain information that you or your contractors believe to be proprietary, you must apply in writing to this office, within twenty-five days of the date of this letter, to withhold such information from public disclosure. The application must include a full statement of the reasons for which the information is considered proprietary, and should be prepared so that proprietary information identified in the application is contained in an enclosure to the application. l l 8103090 7 7\\
- - . . - . . ._ ._- . . . Commonwealth Edison Company -2- lJAN 2 6 ;;g , We will gladly discuss any questions you have concerning this
inspection. Sin erely, . , G. 1orelli, Chief Reactor Construction and Engineering Support Branch Enclosures: 1. Appendix A, Notice
of Violation 2. IE Inspection Reports No. 50-454/80-24 and No. 50-455/80-22 cc w/encls: J. S. Abel, Director of Nuclear Licensing Gunner Sorensen, Site Project Superintendent V. I. Schlosser, Project Manager R. E Querio, Station Superintendent Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Dean Hansell, Office of Assistant Attorney General Myron M. Cherry l . - - - _ - . . }}