Interim Deficiency Rept Re Fuel Pool Penetration Piping ASME Welds.Full Implementation of Corrective Action Is Incomplete.Final Rept Will Be Sent by 810301
ML20008E791
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/26/1981
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8103090683
Download: ML20008E791 (1)


Text

3

+

P O Box 5000 e CLEVELANo. OHIO 44101 e

TELEPHONE (216) 622-9800 e ILLUMINATING OLOG.

e 55 PUBLIC $oVARE Dalwyn R. Davidson wcE paEsicENr SYSTEu ENGINEERING ANO ccNSTRucTioN February 26, 1981 Mr. James G. Keppler Director, Region III 9

Of fice of Inspection and Enforcement q,

U.S. Nuclear Regulatory Commission

//

p.,

799 Roosevelt Road

/ Y.(

Glen Ellyn, Illinois 60137 l'

g

. s a%

y

. y'

Dear Mr. Keppler:

4

+

Perry Nuclear Power Plant

,/,

Docket Nos. 50-440; 50-441 1 q".,. c..

Significant Deficiency

~

'~

Fuel Pool Penetration Piping ASME Welds The interim report regarding the subject significant defic-iency stated that the final report is scheduled for submittal to your office by March 1,1981.

As discussed with Mr. L. McGregor on February 26, 1981, a course of action has been established, but the work to fully implement that course of action is not complete. A final report will be prepared after the successful completion and i

acceptance of the required weld repairs.

It is anticipated that the final report will be submitted by July 1, 1981.

Very truly yours,

/

J'o dd/7/ &/

Dalw

. Davidson Vice President System Engineering and Construction DRD: bas Soll cc: Mr. Jack Hughes, NRC Resident Inspector, PNPP

-Mr. Victor Stello, Director, Office of Inspection 0

and Enforcement, USNRC, Washington, D.C.

20555 U.S. Nuclear Regulatory Commission, c/o Document Management )D Branch, Washington, D.C.

20555 000 (