Text
3
+
P O Box 5000 e CLEVELANo. OHIO 44101 e
TELEPHONE (216) 622-9800 e ILLUMINATING OLOG.
e 55 PUBLIC $oVARE Dalwyn R. Davidson wcE paEsicENr SYSTEu ENGINEERING ANO ccNSTRucTioN February 26, 1981 Mr. James G. Keppler Director, Region III 9
Of fice of Inspection and Enforcement q,
U.S. Nuclear Regulatory Commission
//
p.,
799 Roosevelt Road
/ Y.(
Glen Ellyn, Illinois 60137 l'
g
. s a%
y
. y'
Dear Mr. Keppler:
4
+
Perry Nuclear Power Plant
,/,
Docket Nos. 50-440; 50-441 1 q".,. c..
Significant Deficiency
~
'~
Fuel Pool Penetration Piping ASME Welds The interim report regarding the subject significant defic-iency stated that the final report is scheduled for submittal to your office by March 1,1981.
As discussed with Mr. L. McGregor on February 26, 1981, a course of action has been established, but the work to fully implement that course of action is not complete. A final report will be prepared after the successful completion and i
acceptance of the required weld repairs.
It is anticipated that the final report will be submitted by July 1, 1981.
Very truly yours,
/
J'o dd/7/ &/
Dalw
. Davidson Vice President System Engineering and Construction DRD: bas Soll cc: Mr. Jack Hughes, NRC Resident Inspector, PNPP
-Mr. Victor Stello, Director, Office of Inspection 0
and Enforcement, USNRC, Washington, D.C.
20555 U.S. Nuclear Regulatory Commission, c/o Document Management )D Branch, Washington, D.C.
20555 000 (