ML20008E714
| ML20008E714 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 03/02/1981 |
| From: | Ballinger P NEBRASKA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML20008E711 | List: |
| References | |
| NUDOCS 8103090506 | |
| Download: ML20008E714 (5) | |
Text
-
O I
OPERATING DATA REPORT DOCKET NO. 050-298 DATE 3-2-81 COMPLETED BY P. L. Ballinger TELEPHONE in?-A?9-1811 OPERATING STATUS
- 1. Unit Name:
Nc av N"cla'" 9 P '" kn Februarv 1981
- 2. Reporting Period:
2381
- 3. Licensed Thermal Power (MWt):
836
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
778 787
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
i None 640 MWe Net
- 9. Power Level To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
Tennernrv Turbino Modiffcatiens i
This Month Yr.-to.Date Cumulatise 672.0 1.416.0 58.441.0
- 11. Hours In Reporting Period 672.0 1,416.0 49,005.4
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 672.0 1,416.0 48,133.8
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1,552,272.0 3,231,144.0
,93,013,254.0
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 411.408.0.
R95.796.0 29.372.810.0
- 18. Net Electrical Energy Generated (MWH) 417 61' n 966 on?.n
?A 111 '1? 0
- 19. Unit Service Factor 100.0 100.0 82.4 100.0 100.0 82.4
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
R1.1 R0.1 63.4 79.9 78.7 62.3
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 4.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
Refueline and v intenance Outage. April 26. 1981, 30 davs a
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achieved i
i INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION l
g.-,
l l
8103090506
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-298 LWIT Cocoer Nuclear Stat.
3-2-81 DATE COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 MON 111 Februarv DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) iMWe Net) 637 g7 620 618 2
636 g3 635 3
39 616 4
633 20 615 5
632 21 617 6
630 611 7
624 33 624 g
627 24 617 9
637 25 617 10 635 26 615 11 632 27 612 630
- g 612 12 13
^?7 29 la 529 30 15 628 3:
638 16 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
49/77)
I I
UNil SilUIDOWNS ANI) POWER REDUCilONS 4 gf C op r Nuclear Station DALE 3-2-81 COMPLE1ED itY L_.L.
rn111 neer RI. PORI MONill Feb rua ry 1El.IPilONE 402-825-3811' jg
'h
)s' Licensee
,E g v,
Cause & Conective No.
Da'e i
Eg
[a jy5 1: vent y7 g3 Action to Repois e mO u
Pievent Recunence fI y
y g3 H
c o
U e
6 NONE DURINL REP ( RTING PI RIOD I
2 3
4 l': l'os ted Reason:
Mettuid:
Exhibit G - Instsuctions S: Stheduled A-Equipinent Failure (Explain) 1 -Manual for Picparation of Data 11-Maintenance of Test 2-Manual Scram.
Entry Sheets for 1.icensee C-Refueling 3 Automatic Scrain.
Event Repoit (l.l:R) File INilRI G.
D-Regulatory Restriction 4-Other (limplain) 0161)
E. Operator Training & l.icense I:xamination I - Administ rative 5
Eshibit I-Same Somte G-Operational Enor (lixplain) p>/77 )
lI Other ( fixplain)
OPERATION NARRATIVE COOPER NUCLEAR STATION February 1981 The facility operated the month of February with no scheduled or un-scheduled power reductions or outages at a capacity factor of approx-imately 80%.
i e
i Cooper Nuclear Station Refueling In.ormation Request Enclosure to Monthly Operating Report c'ebruary 1981 1.
Facility - Cooper Nuclear Station 2.
Scheduled Refueling S/D - April 26, 1981 3.
Scheduled Refueling S/U - May 23, 1981 4.
License amendment required? - Yes 1
Operating Minimum Critical Power Ratio (MCPR) limits are a.
i being revised.
4 5.
License Document Submittal - March 5,1981 - Reload Licensing j
Submittal - Y1003J01A17 and proposed l
Technical Specifications 4
I 6.
New licensing considerations - None l
7.
Fuel assemblies currently (a) In Core - 548 (b) Spent Fuel Storage - 620 (includes 112 new fuel assemblies) 8.
Licensed spent fuel storage capacity - 2366 assemblies 9.
Last discharge assuming present capacity - 1996 i
4 l
i f
i
....